6.9
Verifying Basic Installation
On connection of DC power to the HM or RBM, verify its operational state by checking the LED located
on the bottom of the unit.
As the HM or RBM starts up, the LED runs through the states shown in Figure 24, “HM and RBM LED
States”.
Figure 24 HM and RBM LED States