background image

 
 

2

 

IMPORTANT !! 
 

Warning: 

Sections labeled “Warning” can lead to serious injury or death if not followed.  Please 

read these thoroughly and understand them completely before use.  If you do not 
understand them or have any questions, contact your retailer or Blichmann Engineering 
(www.BlichmannEngineering.com) before use. 

 

Caution: 

Sections labeled “Caution” can lead to equipment damage or unsatisfactory performance 
of the equipment.  Please read these sections thoroughly.  If you have any questions, 

contact your retailer or Blichmann Engineering (www.BlichmannEngineering.com) before 
use.

 

 

Assembly: 

 

Threaded fittings 

 
It is not necessary or recommended to use thread sealing tape on the threaded fittings of the tri-clamp 

bulkhead fitting.  The sealing is accomplished by the o-ring, not the threaded joint.   
 
To install the tri-clamp bulkhead fittings first sanitize the surface of the hole in the lid with sanitizer 

using a cotton ball or clean cloth.  Sanitize the fittings and o-ring, and install the o-ring in the grove of 
the bulkhead fitting.  Please the bulkhead nut through the hole in the tank and thread the bulkhead 

fitting onto it hand tight.  If you feel any resistance to movement, or dragging of the threads STOP 
IMMEDIATELY.  Cross threaded fittings are NOT covered under warranty and will not come apart.  
Leaving the fittings wet with sanitizer will aid in assembly and act as a lubricant.  Use an open end 

wrench on one side (see fig 1a) and the special tool and ratchet wrench on the other side as shown in fig 
1b to tighten the fitting. 
 

 

 

 

 

 

 

 

Install the elbow and barb fittings using the clamps and gaskets as shown in Fig 2.  Install the P-clip 
and hose (1” ID hose not included) as shown in Fig 3 and place it in a bucket (not included) filled ½ full 
of sanitizer.  Ensure that the hose is immersed at all times.  After primary fermentation is past high 

krausen and bubbling out of your blow-off hose has stopped you can remove the blow-off hose and 
elbow and replace it with the stopper and airlock as shown in Fig. 5 for the remainder of the 
fermentation. 

 

 

Fig. 1a 

Fig. 1b 

Summary of Contents for Fermenator TC Blow-off kit V2

Page 1: ...uct PLEASE READ THOROUGHLY PRIOR TO USE FOR IMPORTANT SAFETY INFORMATION Unpacking Please ensure that you have the following items packaged with your blow off kit Note that some items may have been preassembled for protection in shipment 2 Gasket 1 tri clamp EPDM 2 1 tri clamp clamps with wing nuts 1 1 tri clamp 90 degree stainless steel elbow 1 Bulkhead nut 1 male thread X 1 tri clamp 1 Bulkhead ...

Page 2: ...ean cloth Sanitize the fittings and o ring and install the o ring in the grove of the bulkhead fitting Please the bulkhead nut through the hole in the tank and thread the bulkhead fitting onto it hand tight If you feel any resistance to movement or dragging of the threads STOP IMMEDIATELY Cross threaded fittings are NOT covered under warranty and will not come apart Leaving the fittings wet with s...

Page 3: ...F HOSE Dangerous over pressurization could occur from plugging of this hose The 1 barb allows adequate area for blow off material hops etc to pass without clogging After Use Cleaning and Storage After use rinse with hot water and soak the fittings and seals in hot PBW solution or boil as in the sanitizing procedure Thoroughly dry all seals and o rings and store them in a plastic bag and place insi...

Page 4: ...r any implied warranty of fitness is limited in duration to the terms of this limited warranty and is limited in scope of coverage to this warranty Blichmann Engineering disclaims any express or implied warranty including any implied warranty of fitness for a particular purpose or merchantability on items excluded from coverage as set forth in this limited warranty 2 Blichmann Engineering makes no...

Reviews: