![BLAUBERG CIVIC EC DB 1000 User Manual Download Page 12](http://html.mh-extra.com/html/blauberg/civic-ec-db-1000/civic-ec-db-1000_user-manual_2769857012.webp)
blaubergventilatoren.de
CiViC eC dB 1000
12
Detach the front block.
Unscrew the screws on the front block and remove the panel with the louvre shutters.
Detach the connectors for connecting control devices.
Remove the screws and disconnect the front block from the three blocks attached to each other.
Install the L-brackets on the central block.
Remove the preheater in the CIVIC EC DBE 1000 and CIVIC EC DBE2 1000 units.
a)
Unscrew the screws on the cover of the heater control unit
and remove it. Remove the screws that secure the heater.
b)
Remove the heater with the control box.
Hang and fasten the unit to the ceiling and wall.
Install three units fixed to each other on the mounting bracket and connect the air ducts to the unit spigots.
On the left and right blocks, tighten the screws on the brackets that fix the unit to the wall.
Fix the unit to the ceiling using L-brackets with anchor bolts.