background image

CONNECTION TO POWER MAINS

Connection to power mains must be conducted in compliance with the automation user’s manual.

TECHNICAL MAINTENANCE

OPEN THE UNIT FOR INSPECTION AND SERVICE NOT LESS THAN 2 MINUTES AFTER 

COMPLETE DE-ENERGIZING OF THE UNIT. 

THE FANS ROTATION MAY BE STILL PRESENT. 

IN CASE OF ANY ABNORMAL NOISE, SMELL AND COMPONENT DEFORMATION 

IMMEDIATELY CUT OFF POWER SUPPLY TO THE UNIT AND CONTACT  

A SERVICE PROVIDER OR THE UNIT SELLER.

The unit operation requires regular inspection, dry cleaning of inner components, check-up and replacement of air filters in case of filter 
contamination. 3-6 months after commissioning of the unit it must be inspected by a service expert for planned preventive maintenance 
of the unit. Next maintenance operations must be conducted at least every 6-12 months. 
Maintenance periodicity is determined by a service expert depending on operation conditions of the unit. 
Dust deposits on the inner parts of the unit, especially in the electric heater, may lead to unpleasant odours. 
It is not a malfunction. Clean the unit to troubleshoot unpleasant odours. 

Open the service doors to access the filters.

Remove the filter elements.

www.blaubergventilatoren.de

Blauair cFv

11

Summary of Contents for BlauAir BL02 CFV 1500

Page 1: ...Heat recovery air handling unit BlauAir CFV USER S MANUAL EN ...

Page 2: ...nnections and maintain ventilation units Do not attempt to install the product connect it to the mains or perform maintenance yourself This is unsafe and impossible without special knowledge Disconnect the power supply prior to any operations with the unit All user s manual requirements as well as the provisions of all the applicable local and national construction electrical and technical norms a...

Page 3: ...not close or block the intake or extract vents in order to ensure the efficient air flow Do not sit on the unit and do not put objects on it The information in this user s manual was correct at the time of the document s preparation The Company reserves the right to modify the technical characteristics design or configuration of its products at any time in order to incorporate the latest technolog...

Page 4: ... kVent with pGDE control panel Service modification L left sided modification R right sided modification Cooler type _ no cooler CDX DX cooler CW water cooler Heater type _ no heater HE electric heater HW water heater Rated air capacity m3 h Unit installation modification P ceiling H double deck V vertical Heat exchanger type R rotary CF counter flow Casing dimensions Unit series The air handling ...

Page 5: ...nt to prevent its freezing Hazardous parts access and water ingress protection rating IP54 for the unit motors IP40 for the assembled unit connected to the air ducts without extra cover or weather hoods IP44 for the assembled unit with connected air ducts extra cover and weather hoods specially ordered accessories IP00 for the unit not connected to the air ducts The unit design is constantly being...

Page 6: ... 3 electric heater only for the units with electric heater 4 supply fan 5 supply filter 6 extract fan 7 heat exchanger 8 extract fan 9 air flow control damper with electric actuator 10 bypass damper 11 control unit 12 removable holder UNIT DESIGN AND OPERATING LOGIC BlauAir CFV 6 www blaubergventilatoren de ...

Page 7: ...r duct positioning For this purpose the side walls are plugged To change positioning of the air ducts use the plugs from the side walls for the front panel Supply air Exhaust air Intake air Extract air www blaubergventilatoren de BlauAir CFV 7 ...

Page 8: ...ake air duct red for the supply air duct and brown for the exhaust air duct During installation works sufficient maintenance and service access must be provided The recommended minimum distances from the unit to the walls are shown below For the models with a water heater For the models without water heater A 450 A Casing dimensions A mm BL02 CFV 850 BL03 CFV BL07 CFV 1000 ALL OPERATIONS DESCRIBED...

Page 9: ...ust be selected based on air pressure in the section and are stated in the table H h H h Complete fan pressure Pa Size H mm Size h mm 600 100 50 600 1000 140 70 1000 1400 190 95 1400 1800 240 120 1800 2200 290 145 2200 2600 340 170 Connect the drain pipe U trap and sewage system using metal plastic or rubber connecting pipes min 3 3 2 1 2 4 1 drain pipe 2 connecting pipe 3 U trap 4 sewage system P...

Page 10: ...or the models with water heater While connecting the water heater keep the straight air duct section length not less than 400 mm from the unit Otherwise the maintenance panel cannot be opened 400 BlauAir CFV 10 www blaubergventilatoren de ...

Page 11: ...ing of inner components check up and replacement of air filters in case of filter contamination 3 6 months after commissioning of the unit it must be inspected by a service expert for planned preventive maintenance of the unit Next maintenance operations must be conducted at least every 6 12 months Maintenance periodicity is determined by a service expert depending on operation conditions of the u...

Page 12: ... access the heat exchanger remove the holder 13 see page 7 Loosen the screws 1 on the retaining clamps 2 using a hexagon wrench 1 1 2 Pull the heat exchanger out BlauAir CFV 12 www blaubergventilatoren de ...

Page 13: ...tions to prevent possible damage to the unit Follow the handling requirements applicable for the particular type of cargo The unit can be carried in the original packaging by any mode of transport provided proper protection against precipitation and mechanical damage The unit must be transported only in the working position Avoid sharp blows scratches or rough handling during loading and unloading...

Page 14: ...cturer s warranty does not apply to the following cases User s failure to submit the unit with the entire delivery package as stated in the user s manual including submission with missing component parts previously dismounted by the user Mismatch of the unit model and the brand name with the information stated on the unit packaging and in the user s manual User s failure to ensure timely technical...

Page 15: ...________ unit is installed pursuant to the requirements stated in the present user s manual Installation Stamp Company name Address Phone Number Installation Technician s Full Name Installation Date Signature The unit has been installed in accordance with the provisions of all the applicable local and national construction electrical and technical codes and standards The unit operates normally as ...

Page 16: ...www blaubergventilatoren de B192 5EN 02 ...

Reviews: