background image

EN

23

SAFETY REQUIREMENTS

The fans belong to devices of the Class A insulation by type of protection 
against electric-shock hazard.
Level of protection against access to hazardous parts and water 
ingress protection is IP24.
Before connection of the fan to network, you should be convinced of 
absence of visible damages of the impeller, case, cover, and that there 
are no foreign objects left in flowing part of the case which can damage 
impeller.
The fan connection should be carried out by the expert electrician who 
has the admission to the works and has studied this manual. 
The fan service and repair should be made only after its disconnection 
from the network system.

                              Operation of fans outside of the temperature range, 
                              as well as in premises with aggressive impurities in air 
                              and in explosive environment. 

You should take measures for prevention against ingress of 
blackdamp in a room through open flues or other fire-prevention 
installations. 
A possibility of return gas flow from the devices using gas or open 
flame should be excluded.

FORBIDDEN

INSTALLATION AND PREPARATION FOR WORK

                               All works on installation and connection of the fans 
                               should be carried out only by the removed network 
                               system voltage.

                               Connection of the fans to network system should be 
                               carried out through the switch embedded in the fixed 
                               wiring, with contact gaps at least 3 mm on all poles.

The direction of air injection should coincide with the arrow direction on 
the fan case. 
The scheme of the fan connection is shown on fig. 5. 
Installation variants are shown on fig. 6, 7 and 8. 

ATTENTION

Summary of Contents for Brise 100

Page 1: ...Operation manual Eco Brise EN...

Page 2: ...18 EN...

Page 3: ...d therefore some models can differ from described in the present certificate DELIVERY SET The delivery set contains Fan 1 pcs Operation manual Screws with dowels 4 pcs Packing box BASIC CHARACTERISTIC...

Page 4: ...EN 20 Fig 1 1 electric motor 2 control box cover 3 control box 4 switching box 5 connector block 6 fan case 7 impeller 8 fan cover 9 control card 10 automatic diaphragm 1 2 3 4 5 6 7 8 10 9...

Page 5: ...EN Fig 2 1 electric motor 2 impeller 3 control box cover 4 control box 5 switching box 6 connector block 7 fan case 8 ring 9 fan cover 1 2 3 4 5 6 7 8 9 21...

Page 6: ...power W Weight kg Eco 100 Brise 100 Brise 100 max Table 1 Noise level dBA 70 53 62 6 2 7 3 5 0 7 0 7 0 7 23 21 22 Fig 3 Overall and connecting sizes of fan ECO Fig 4 Overall and connecting sizes of fa...

Page 7: ...f fans outside of the temperature range as well as in premises with aggressive impurities in air and in explosive environment You should take measures for prevention against ingress of blackdamp in a...

Page 8: ...EN 24 L POWER NETWORK CONNECTION DIAGRAM Fig 5 Fig 6 N 220 240 V...

Page 9: ...EN 25 Fig 8 Fig 7...

Page 10: ...fixing apertures fig 10 3 Drill the apertures in a wall and insert the dowels fig 11 4 Connect the network cable to the connector block fig 12 The network cable length should be not less than 220 mm...

Page 11: ...EN 27 Fig 11 Fig 10 100 5 20 2 7...

Page 12: ...28 Fig 13 Fig 12 EN...

Page 13: ...EN 29 Fig 15 Fig 14...

Page 14: ...should be carried out only after its disconnection from the network The maintenance refers to periodic clearing of the fan surfaces of dust and dirt Carry out the cleaning with a soft cloth moistened...

Page 15: ...ompatibility This certificate is issued following test carried out on samples of the product referred to above Assessment of compliance of the product with the requirements relating to electromagnetic...

Page 16: ...ECO_BRISE_DE_EN 02 SALE DATE SELLER MANUFACTURING DATE STAMP OF INSPECTOR Eco 100 Brise 100 Brise 100 max The model underline the necessary is serviceable...

Reviews: