www.blaubergventilation.com.au
Blaultra
9
MOUNTING SEQUENCE
1. Use the template to mark the mounting
location for the fan and make a hole in
the ceiling Ø 300 mm.
Ø
300
2. The flexible air duct is pushed through
the hole from behind the ceiling, from
above. The air duct is installed on a spigot
with a non-return valve.
3. Before installation, it is required to
loosen the self-tapping screws on the
rocking levers, thereby increasing the gap
between the casing and the lever.
4. The spigot and the air duct are installed
on the fan.
Plug the fan into the required GPO in the
ceiling, making sure power to the GPO is
switched off.
5. The fan assembly is inserted into the
ceiling opening from the room side.
6. Secure the fan by turning the levers.
7. After installing the fan, it is necessary
to clamp the self-tapping screws on the
rocking levers to press the fan casing
against the ceiling.
8. Install the decorative panel (purchased separately for the BLAULTRA model) on the fan
casing. The panel is mounted in accordance with the User’s manual for the decorative
panel.