9
EN
TECHNICAL MAINTENANCE
The fan maintenance periodicity is at least once per 6 months.
Maintenance steps:
• Disconnect the fan from power supply and make sure electricity has been turned off (Fig. 14).
• Remove the front panel and the protective screen, wipe the fan with a dry cloth or a brush (Fig. 15).
• Clean the front panel under running water (Fig. 16).
• Wipe the fan surfaces dry.
• Cover the fan with the front panel.
• Connect power supply to the fan (Fig. 17).
CAUTION! Do not allow water or liquid come into contact with electric components!
STORAGE AND TRANSPORTATION REGULATIONS
• Store the unit in the manufacturer’s original packaging box in a dry closed ventilated premise with temperature range
from +5 °C to + 40 °C and relative humidity up to 70 %.
• Storage environment must not contain aggressive vapors and chemical mixtures provoking corrosion, insulation, and
sealing deformation.
• Use suitable hoist machinery for handling and storage operations to prevent possible damage to the unit.
• Follow the handling requirements applicable for the particular type of cargo.
• The unit can be carried in the original packaging by any mode of transport provided proper protection against precipitation
and mechanical damage. The unit must be transported only in the working position.
• Avoid sharp blows, scratches, or rough handling during loading and unloading.
• Prior to the initial power-up after transportation at low temperatures, allow the unit to warm up at operating temperature
for at least 3-4 hours.
Summary of Contents for BLABBRAVO 100
Page 1: ...USER S MANUAL BLABBRAVO AXIAL WALL CEILING FAN EN...
Page 13: ...13 EN 3 4...
Page 14: ...14 EN QF L N 5 6 7 8 9 10 11 12...
Page 16: ...16 EN QF L N 14 15 16 17...
Page 17: ...17 EN...
Page 18: ...18 EN...
Page 20: ...B_Australasia175EN 03 www blaubergventilation com au BLABBRAVO BLABBRAVO 100 125 150...