CONNECTION TO POWER MAINS
Connection to power mains must be conducted in compliance with the automation user’s manual.
TECHNICAL MAINTENANCE
OPEN THE UNIT FOR INSPECTION AND SERVICE NOT LESS THAN 2 MINUTES AFTER
COMPLETE DE-ENERGIZING OF THE UNIT.
THE FANS ROTATION MAY BE STILL PRESENT.
IN CASE OF ANY ABNORMAL NOISE, SMELL AND COMPONENT DEFORMATION
IMMEDIATELY CUT OFF POWER SUPPLY TO THE UNIT AND CONTACT
A SERVICE PROVIDER OR THE UNIT SELLER.
The unit operation requires regular inspection, dry cleaning of inner components, check-up and replacement of air filters in case of filter
contamination. 3-6 months after commissioning of the unit it must be inspected by a service expert for planned preventive maintenance
of the unit. Next maintenance operations must be conducted at least every 6-12 months.
Maintenance periodicity is determined by a service expert depending on operation conditions of the unit. Dust deposits on the inner
parts of the unit, especially in the electric heater, may lead to unpleasant odours. It is not a malfunction. Clean the unit to troubleshoot
unpleasant odours.
Open the service doors to access the filters.
Remove the two butterfly bolts that fix the retaining
clamp.
Remove the filter elements.
To access the heat exchanger remove the service panel. Disconnect the socket from the actuator. Pull the heat exchanger out.
BlauAir rh
8
www.blaubergventilatoren.de