Blastrac BMP-265 Operating Instructions Manual Download Page 17

 

 

 

17 

6.  Maintenance 

 

Please read the OWNER’S MANUAL of the petrol engine for the proper maintenance schedules. 

 
Pay attention to Chapter 3 "Safety" during maintenance and repair works.  
 
Failures due to inadequate or incorrect maintenance may generate very high repair costs and long standstill 
periods of the machine. Regular maintenance therefore is imperative. 
 
Operational safety and service life of the machine depends, among other things, on proper maintenance. 
 
The following table shows recommendations about time, inspection and maintenance for the normal use of the 
machine.  
 

Operating hours/ 

time period 

Inspection points, maintenance instructions 

12 h after repairing 

Check all accessible screw connections for tight seat. 

Daily and prior to 
starting work 

Check that all safety devices working adequate. 
Check whether there is any foreign matter in the scarifying drum. 
Clean the scarifying drum specially in case of moist surfaces. 
Check the scarifying drum, lateral axles, tools and housing for wear. 
Check the tension of the belt, stretch again if necessary. 
Check the electric connections for sediments of dirt or foreign bodies. 
Check the electric motors for dirt and other contaminants. 
Check all safety devices working adequate. 
Check the function of the residual current operated device.  
Check the hose connections for tightness and fixed seat. 
Make sure that the dust bin is emptied 

Annually 

Full overhaul and cleaning of the complete machine. 

 
 
The time indications are based on uninterrupted operation. When the indicated number of working hours is not 
achieved  during  the  corresponding  period,  the  period  can  be  extended.  However  a  full  overhaul  must  be 
carried out at least once a year. 
 
Due  to  different  working  conditions  it  can’t  be  foreseen  how  frequently  inspections  for  wear  check’s, 
inspection,  maintenance  and  repair  works  ought  to  be  carried  out.  Prepare  a  suitable  inspection  schedule 
considering your own working conditions and experience. 
 
Pay attention to unusual noises or strong vibrations. Check for the cause of every big change. Call a technician 
if you have doubts about the cause or when a repair without a technician seems not possible without damages. 
Only use genuine Blastrac spare parts. 
 
Our specialists will be happy to assist you with more advice. 

Prior to any repair works on the machine and its drives, secure the machine against 
unintentional switching on. Put the machine to its safety off position.
 

 

The machine is in a safe condition when it cannot generate any hazard.

 

 

Follow additional operating and maintenance instructions  of Original Equipment Manufacturer  
if included during your service and maintenance work. 

 
Further is advised: 
Store the cleaned and dry machine in a dry and humid free room. Protect the electrical motors from moisture, 
heat, dust and shocks. 
 
 
 
 

Summary of Contents for BMP-265

Page 1: ...Original Instructions in English language OPERATING INSTRUCTIONS BMP 265 E B VERSION 2 3...

Page 2: ...s Repairs Cleaning Test on By Inspection before initial operation on __________________________________________ By __________________________________________ Date of initial operation ________________...

Page 3: ...of electrical power supply 11 4 2 Checkpoints of the petrol engine 11 4 3 Checkpoints of the machine 12 4 4 Manual moving of the machine 12 4 5 Removing the drum 12 4 6 Mounting the drum 12 4 7 The sc...

Page 4: ...ther purposes The manufacturer will not be liable for damage resulting from incorrect usage in these cases the user assumes all risks The drum of the scarifiers revolves at 1500 revolutions per minute...

Page 5: ...1 MPL272SL265 Refill set MPL265 MPL60SL265 Refill set MPL60 MPL75SL265 Refill set MPL75 1 MPL272 Standard 8pt cutter MPL60 12 pt milling cutter MPL75 1 Milling cutter 6pt 1 Lifting point 5 Quick lift...

Page 6: ...g j Remove electrical cables and dust hose s from the surface to be treated k Make sure that there are no cables or hoses in the driving direction of the machine l Make sure that there is nothing stan...

Page 7: ...ely off of the reels c Any damage to the electric cables and or electrical components is not permitted d If the power supply cable or plug is damaged it must be replaced immediately Only use original...

Page 8: ...laying backwards for a long time because this may result in fuel spillage 3 6 Dust collector safety by a machine a Always use a Blastrac dust collector to ensure a dust free operation of the machine...

Page 9: ...and directly below the machine g When transporting the machine do so in such a manner that damage due to the effects of the use of force or incorrect loading and unloading is avoided h The lifting eye...

Page 10: ...n this machine Wear protecting gloves Safety shoes obliged Consult the manual before operating the machine Name address and CE mark The machine type The net weight of the machine in kilogram The year...

Page 11: ...the current legal regulations and directives in force this applies to the protective earth conductor in particular in order to ensure that all safety devices are functioning and to eliminate possible...

Page 12: ...the electric cable and the dust hose 4 5 Removing the drum Make sure all moving parts of the machine have come to a complete standstill before changing the drum Pull out the key of the deadmansswitch...

Page 13: ...a loose tool seated on an axle The rotation of the scarifying drum generates a centrifugal force on the flails or cutters which are kept by the lateral axles The flails will be thrown outwards as far...

Page 14: ...the lateral axle When the depth adjustment is correctly selected the scarifier will run quiet and constant Oval worn flails or cutters as well as broken drum axles indicate a too high scarifying dept...

Page 15: ...to run at the correct RPM Check if the drum turns the right direction Only BMP 265E Slowly let down the quick lift lever Turn the fine adjustment clockwise till the desired scarifying depth is reache...

Page 16: ...eated and the desired profiling The correct advancing speed can be found out by observing the treated surface and varying the speed during the scarifying milling process Slight profiling on concrete r...

Page 17: ...e hose connections for tightness and fixed seat Make sure that the dust bin is emptied Annually Full overhaul and cleaning of the complete machine The time indications are based on uninterrupted opera...

Page 18: ...um should be disassembled in order to rearrange it in a different way or to replace wear parts it is absolute necessary to observe the quantity and quality of flails cutters and spacers as described i...

Page 19: ...n parts Check the bearing on the axle drive shaft and replace if necessary Check the tension of the belt replace the belt if necessary Replace the motor Reduced or no scarifying performance Tools have...

Page 20: ...n during heavy operation on concrete The noise and vibration levels depend on the working depth which is in turn determined by the unevenness of the surface The impact force of the tools onto the surf...

Page 21: ...te but should be disposed of at a suitable proper collection system e g via your communal disposal location This way the materials can be re used in an environmentally responsible manner Despite the f...

Page 22: ...rd Str 15 50829 K ln Tel 49 0 221 709032 0 Fax 49 0 221 709032 22 Email info blastrac de WWW BLASTRAC DE BLASTRAC UKRAINE SALES SERVICE CENTRE Nezalezhnosti 14 of 21 07400 Brovary Tel 38 0 44 222 51 2...

Reviews: