Blagdon Affinity mocha corner Instructions Download Page 3

OR WATERFALL INSTALLATION: 

Step 24 

Attach the waterfall bracket to the waterfall 
clips. 
 
 
 
 
 
 
 

 
 
 
 

Step 25 

Clip the waterfall bracket onto the top rail 
across the back corner (ensuring the cables 
for the filter are in between the clips. Attach the 
supplied waterfall.

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Step 26

Connect the waterfall hose to the Inpond 
outlet, fill the pond with dechlorinated water 
and enjoy.

Step 9

Insert the A panels (without windows) across the 
legs on the A rails.

 

 

 

Step 10

Slide the A panels (without windows) into the 
slots on the legs of the A and B rails. 
 

 
 

 
 
 

Step 11

Slide the B panels (with windows) into the slots 
on the legs of the C rails. 

 

 

 

 

 

 

 

 

 

 

Step 12

Slide the C panel (with window) into the slots 
on the legs of the D rail – ensure that all panels 
are pulled down to the top rails. 
 

 

Step 13

Insert the leg cross braces labelled A across the 
gaps between the legs of the A rails – lock in 
place with the keys.

 
 
 

Step 14

Insert the leg cross braces labelled B across the 
gaps between the legs of the B rails – lock in 
place with the keys.
 

 
 
 
 
 
 
 
 
 
 
 

Tip: 

To make installation of the leg cross 

braces easier, allow the weave panels to 

warm up prior to use - place in direct sunlight 

for 20-30 minutes, or place them in an airing 

cupboard overnight if building the pool during 

the winter.

Tip: 

Use the flat face of the provided tool to 

make it easier to push in the plant fixing pins.

B

B

B

B

A

B

Insert this way

Step 18

Place the liner bag inside the frame and open 
it up – turn the liner to align the clear windows 
with the portholes on the weave panels.

 

Step 19

Working around the liner hook the eyelets onto 
the hooks on the trident connectors.

 

 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Step 20 

Using plant basket fixing pins, pin up the rest 
of the liner eyelets onto the vertical face of the 
top rails.
 

Step 21

 
Using the plant basket fixing pins attach the 
plant baskets to the underside of the top rail.
 

 
 
 
 
 
 
 
 
 
 
 

Step 22

Place the Inpond filter into the pool and run the 
cables out of the back corner. 
 

 
FOUNTAIN INSTALLATION
 

 
 

Step 23

Attach the fountain fittings with your chosen 
fountain head to the Inpond following the 
instructions in the Inpond manual, fill the pond 
with dechlorinated water, turn on the power 
and enjoy. 

 

Step 15 

Push the supplied feet onto the bottom of the 
legs.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Step 16 

Using the strengthening wire, hook a loop over 
the foot of one of the 90

o

 legs holding an A 

and B rail. Draw it across to the opposite 90

o

 

leg, and hook the other loop over the foot. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Step 17 

Between two people turn the frame over.

3

1

1

2

2

2

1

1

2

1

2

Reviews: