22 POP-UP ROD LINKAGE & ADJUSTMENT
Place one end of Spring Clip (
22C
) on end of Ball Rod (
22B
). Insert Ball
Rod (
22B
) across and through hole in Pop-Up Strap (
22D
). Secure other
end of Spring Clip (
22C
). Insert bottom of Lift Rod (
22A
) into hole at top of
Pop-Up Strap (
22D
). Tighten with Thumb Screw (
22E
). Adjust Lift Rod
(
22A
) function by adjusting location of Thumb Screw (
22E
) along the
Pop-Up Strap (
22D
) or by adjusting the hole in which Ball Rod (
22B
)
goes through the Pop-Up Strap (
22D
). Be sure to leave enough space
between Lift Rod Knob (
22F
) and Spout Head (
22F
22F
22G
) when Lift Rod is down.
23 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below
the sink.
21 BALLROD ADJUSTMENT
Drop the Stopper (
21A
) into Drain Body (
21B
) from the top with the Off-Set
(
21C
) facing rear. From below, insert the Ball Rod (
21D
) into the Ball Rod
Opening (
21E
) through the Stopper Hole (
21E
21E
21F
) and secure with Nut (
21F
21F
21G
).
20 POP-UP INSTALLATION
Apply a small bead of putty underneath the Flange (
20A
) and place a ring
of putty around Drain Opening (
20B
) of sink. Use PTFE plumber’s tape to
all threaded fi ttings according to manufacturer’s instructions. Insert Flange
(
20A
) into Drain Opening (
20B
). From underneath, insert Rubber Washer
(
20C
) and Friction Washer (
20D
) through the bottom of Flange (
20A
). Thread
Locknut (
20E
) until Rubber Washer (
20E
20E
20C
) seats securely inside Drain Opening
(
20B
). Thread Drain Body (
20F
) to bottom of Flange (
20F
20F
20A
). Hand tighten
and adjust the Drain Body so that the Ball Rod Opening (
20G
) faces the rear.
Wrench tighten Locknut (
20E
) and wipe excess putty.
20E
20E
22
23
20
21
6
ENGLISH
22A
22A
22C
22B
22D
22E
22F
22G
21A
21A
21B
21C
21E
21D
21F
21D
20A
20A
20C
20D
20E
20F
20G
21G
22B
22C
22E
22A
22A
22D
20B