background image

22   POP-UP ROD LINKAGE & ADJUSTMENT

Place one end of Spring Clip (

22C

) on end of Ball Rod (

22B

). Insert Ball 

Rod (

22B

) across and through hole in Pop-Up Strap (

22D

). Secure other 

end of Spring Clip (

22C

). Insert bottom of Lift Rod (

22A

) into hole at top of 

Pop-Up  Strap  (

22D

). Tighten  with Thumb  Screw  (

22E

). Adjust  Lift  Rod 

(

22A

)  function  by  adjusting  location  of Thumb  Screw  (

22E

)  along  the 

Pop-Up  Strap  (

22D

)  or  by  adjusting  the  hole  in  which  Ball  Rod  (

22B

goes  through  the  Pop-Up  Strap  (

22D

).  Be  sure  to  leave  enough  space 

between Lift Rod Knob (

22F

) and Spout Head (

22F

22F

22G

) when Lift Rod is down.

23   UNIT START UP

Turn on hot and cold water supplies, and check for leaks above and below 

the sink.

21   BALLROD ADJUSTMENT

Drop the Stopper (

21A

) into Drain Body (

21B

) from the top with the Off-Set 

(

21C

) facing rear. From below, insert the Ball Rod (

21D

) into the Ball Rod 

Opening (

21E

) through the Stopper Hole (

21E

21E

21F

) and secure with Nut (

21F

21F

21G

).

20   POP-UP INSTALLATION

Apply a small bead of putty underneath the Flange (

20A

) and place a ring 

of putty around Drain Opening (

20B

) of sink. Use PTFE plumber’s tape to 

all threaded fi ttings according to manufacturer’s instructions.  Insert Flange 

(

20A

) into Drain Opening (

20B

).  From underneath, insert Rubber Washer 

(

20C

) and Friction Washer (

20D

) through the bottom of Flange (

20A

). Thread 

Locknut (

20E

) until Rubber Washer (

20E

20E

20C

) seats securely inside Drain Opening 

(

20B

). Thread Drain Body (

20F

) to bottom of Flange (

20F

20F

20A

). Hand tighten 

and adjust the Drain Body so that the Ball Rod Opening (

20G

) faces the rear. 

Wrench tighten Locknut (

20E

) and wipe excess putty. 

20E

20E

22

23

20

21

6

ENGLISH

22A

22A

22C

22B

22D

22E

22F

22G

21A

21A

21B

21C

21E

21D

21F

21D

20A

20A

20C

20D

20E

20F

20G

21G

22B

22C

22E

22A

22A

22D

20B

Summary of Contents for Price Pfister Marielle 49M

Page 1: ... Applique Pour Lavabo 06 16 04 EO6643Z 28692 0200 A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY A COMPANY Copyright 2004 Price Pfister Inc 2004 Price Pfister Inc ...

Page 2: ...d clean the sink surface thoroughly 3 TOOLS RECOMMENDED PTFE plumber s tape or thread sealant Plumber s putty Slotted screwdriver Phillips head screwdriver Pliers Adjustable wrench Flashlight Cloth Your installation may require new supply lines and or shut off valves or other additional tools This product comes with an installation tool used for securing the spout assembly and valve body assemblie...

Page 3: ...Nut 9A by using Installation Tool 9B For better leverage use a Screwdriver 9C insert it through Hole 9D and tighten the Mounting Nut 9A until Valve 9E is firmly secured to sink 9E is firmly secured to sink 9E 10 HOSE CONNECTION TO SPOUT BODY From underneath sink insert the Center Connector 10A onto Spout Shank 10B push the Center Connector 10A up until the top of Socket 10C reaches the Spout Shank...

Page 4: ...ms 13B and tighten so that the Valve Adapters 13A sit on the surface of the Valve Body Washers 13C 14 HANDLE ATTACHMENT Place Plastic Seal Rings 14A against the bottom of Handle Hubs 14B Connect Handles 14C onto Valve Adapters 14D 11 HOSE CONNECTION TO VALVE BODY Slide the End Connectors 11A onto the Valve Bodies 11B Push the End Connectors 11A all the way up until completely seated Be careful not...

Page 5: ...P UP ROD CONNECTION Insert Lift Rod 18A into hole at top of Spout Head 18B Gently slide Lift Rod 18A down the Spout Head 18B hole POP UP DRAIN BODY INSTALLATION STEPS 19 POP UP PREPARATION Remove Flange 19A and unscrew Nut 19C from the Pop Up Drain Body 19B Retain the Packing Ring 19D inside the Ball Rod Opening 19E 19E 19E Take off the Spring Clip 19F from the Ball Rod 19F from the Ball Rod 19F 1...

Page 6: ...ll Rod 21D into the Ball Rod Opening 21E through the Stopper Hole 21E through the Stopper Hole 21E 21F and secure with Nut 21F and secure with Nut 21F 21G 20 POP UP INSTALLATION Apply a small bead of putty underneath the Flange 20A and place a ring of putty around Drain Opening 20B of sink Use PTFE plumber s tape to all threaded fittings according to manufacturer s instructions Insert Flange 20A i...

Page 7: ...ted in the water lines please follow these steps 1 Turn on water supply valves 2 After connections have been made removeAerator 24A and turn Handles to the full ON position 3 Check for leaks retighten where necessary and let lines flush for one minute without moving faucet handles This will remove debris from lines which can damage internal parts of faucet and cause leaks 4 After flushing turn off...

Page 8: ...me Cromo Pulido Chrome Poli J Brushed Nickel PVD Niquel Cepillado PVD Nickel Brosse PVD Z Oil Rubbed Bronze Bronce Frotado Con Aceite Bronze Huilé 931 009 910 025 COLD FRÍO FROID 950 025 950 200 931 600 931 940 971 019 972 019 941 088 910 024 HOT CALIENTE CHAUD 970 016 970 017 940 068 941 087 920 038 949 004 900 024 COLD FRÍO FROID 900 023 HOT CALIENTE CHAUD 941 096 941 092 970 016 970 017 950 025...

Reviews: