background image

INSTALLATION  AND  OPERATING  INSTRUCTIONS  

GAS  CONVECTION  OVEN  

Model:  CO1-G  

 

INTENDED  FOR  OTHER  THAN  HOUSEHOLD  USE 

RETAIN  THIS  MANUAL  FOR  FUTURE  REFERENCE 

OVEN  MUST  BE  KEPT  CLEAR  OF  COMBUSTIBLES  AT  ALL  TIMES  

 

IMPORTANT  INSTRUCTIONS

After  the  gas  supply  has  been  connected  to  your  unit,  it  is  extremely  important  to  check  piping  for  possible 
leaks.  To  do  this,  use  soap  and  water  solution  or  solutions  which  are  expressly  made  for  this  purpose.

DO  NOT  USE

 

matches,  candles,  flames,  or  other  sources  of  ignition  since  these  methods  are  extremely 

dangerous.  Post  in  a  prominent  location  instructions  to  be  followed  in  the  event  you  smell  gas.  Obtain  these 
instructions  from  your  local  gas  supplier. 

Initial  heating  of  oven  may  generate  smoke  or  fumes  and  must  be  done  in  a  well-ventilated  area. 
Overexposure  to  smoke  or  fumes  may  cause  nausea  or  dizziness.

Note:

  Only 

Pizza

  or 

Bread

  can  have  direct  contact  with  ceramic  decks.  All  other  food  products  must  be 

placed  in  a  pan  or  container  to  avoid  direct  contact  with  ceramic  decks.

This  equipment  has  been  engineered  to  provide  you  with  year  round  dependable  service  when  used 
according  to  the  instructions  in  this  manual  and  standard  commercial  kitchen

 

practices.

 

!

!

FOR  YOUR  SAFETY: 

Do  not  store  or  use  gasoline  or  other  flammable 

vapors  and  liquids  in  the  vicinity  of  this  or  any  other  appliance.

!

!

WARNING: 

Improper  installation,  adjustment,  alteration,  service  or 

maintenance  can  cause  property  damage,  injury  or  death.  Read  the  Installation, 
Operating  and  Maintenance  Instructions  thoroughly  before  installing  or 
servicing  this  equipment.

1

   

P/N  U4161A  9/07

Phone:

(864)  963-3471

                                                                                                                                                           

Fax: 

(864)  963-5316 

                                                         

Toll  Free:  (800)  927-6887                                           
Website:  www.bkideas.com
E-mail:

[email protected] 

BKI  Worldwide  Headquarters

PO  Box  80400

Simpsonville,  SC  29680-0400  USA

Summary of Contents for CO1-G

Page 1: ...xposure to smoke or fumes may cause nausea or dizziness Note Only Pizza or Bread can have direct contact with ceramic decks All other food products must be placed in a pan or container to avoid direct contact with ceramic decks This equipment has been engineered to provide you with year round dependable service when used according to the instructions in this manual and standard commercial kitchen ...

Page 2: ... supplied for stacked installations A carton containing a Flue Adapter and or an optional Draft Hood for Direct Venting Not available for European Community Countries B SET UP MOUNTING NOTE This appliance must be installed by competent person in accordance with the rules in force In the U K Corgi registered installers including the regions of British Gas undertake to work to safe and satisfactory ...

Page 3: ...lts 3 Insert Open Rack Shelf and tighten into place with eight 3 8 16 screws washers and nuts 4 Position Rack Supports and tighten in place using 4 each of Flat washers and 5 16 18 Hex Nuts To assemble over a Base Cabinet 1 Tilt cabinet over onto the left hand side Attach two mounting plates to the right underside and screw 6 legs into the center holes 2 Lift up left hand side of the base cabinet ...

Page 4: ...e European Community countries should be as below GasType Supply Pressure G20 20 mbar G25 25 mbar G20 25 20 25 mbar G30 30 or 50 mbar depending on country G31 30 37 or 50 mbar depending on country A separate shut off valve for each oven must be provided It should be as close as possible to the place where the gas line goes into the oven It must be located such that it is easily accessible When sta...

Page 5: ...anges on the outside of the flue stack extending out of the building The flue pipe from the draft hood must not run downwards at any point from the oven to the final outlet It should always slant slightly upwards For best results it should rise straight up NOTE DO NOT PUT A DAMPER IN THE FLUE AND DO NOT CONNECT A BLOWER DIRECTLY TO THE FLUE If the flue runs directly to the free air outside the bui...

Page 6: ...n when done B TIMED COOKING ROTARYCONTROL I Close the oven doors 2 Turn Selector Switch to HI or LO position The indicator light near the Selector Switch will be illuminated 3 Turn the thermostat knob to the desired cooking temperature 4 Upon reaching the set temperature the indicator light near the thethermstat will go out 5 Load the oven with product to be cooked 6 Turn the timer knob to the des...

Page 7: ... NOT USE STEELWOOL Clean The Stainless Steel Interior Baked on splatter oil grease or discoloration on the stainless steel inside of the oven may be removed with stainless steel cleaner or any other similar cleaning agent NEVER use vinegar or any corrosive cleaner Use only cleaners approved for stainless steel NEVER use cleaning solvents with a hydrocarbon base NEVER use a wire brush steel or abra...

Page 8: ...8 wheel puller bolt supplied in center of hub See Fig 3 Clean The Porcelain Interior Porcelain enamel interiors are designed to be as maintenance free as possible However for best results the oven should be cleaned regularly Enameled interiors can be easily cleaned with oven cleaners KEEP CLEANING FLUIDS AWAY FROM ELECTRICAL WIRES LIGHT SOCKETS SWITCHES AND CONTROLPANEL OVEN EXTERIOR Clean The Ext...

Page 9: ... 2 13 x 1 HEX HEAD BOLT 12 REQUIRED 5 16 FLATWASHER 4 REQUIRED 5 16 18 HEX NUT 4 REQUIRED OPEN RACK SHELF RACK SUPPORT 3 8 16 x 3 4 TRUSS HEAD SCREW w NUT WASHER 8 REQUIRED 5 ILLUSTRATIONS CONTINUED CONTROL PANEL ROTARY CONTROL Figure 3 Figure 4 Figure 5 9 SELECTOR SWITCH PILOT LIGHT GREEN SELECTOR SWITCH THERMOSTAT PILOT LIGHT AMBER THERMOSTAT LIGHTS SWITCH TIMER STEAM INJECTION SWITCH ...

Page 10: ...O GC 20 NO COM L2 L1 NO NC ooox ooxo oxoo oxxo 24V 120V BUZZER TIMER M450 1 2 4 S Fan Rotary Switch Off Low High Cool Down Door Switch Solenoid Valve Amber Pilot Light Thermostat Green Pilot Light Temperature Controller Power RAM CO Power Timer Coil Steam Potentiometer Factory Set 8 Seconds Coil Steam Button Ignition Module Valve 2 Speed Motor Interior Lights Momentary Switch Interior Lights 10 ...

Page 11: ...ame sensor ground valve hot thermostat L1 24vac ignitor 3 4 5 6 2 1 7 steam switch steam timer potentiometer blk yel red blu solenoid valve FF PILOT IN 120v 24v ignitor 120VAC 1 2 3 4 S Rotary Switch Door Switch Pilot Light Thermostat Pilot Light Power RAM LO HI COM 7 WIRING DIAGRAM ROTARY CONTROL CO1 G 11 ...

Page 12: ...nsor L1 Ignitor Sensor RAM COM HI LO Door Sw NC NO Lights Switch CO VALVE 120 V Grn Ylo CH 100 FAST T12 T6 T7 T13 T9 T8 T5 T4 T3 T2 24V 120V T11 T10 RTD Probe Rotary Switch P2 P3 P4 P1 1 2 3 4 Closed Open 120 V L1 N BLK 1 WT 2 BLK 11 BLK 3 BLK 5 WT C2 WT 4 BLK S WT S2 WT S1 GREY 7 8 R1 R2 Orange Black A B BLK 13 BLUE 10 BLK C1 BLK 23 BLK 15 GREY 26 27 BLK 17 BLUE 12 BLK WT BLK 21 BLK 19 BRWN BRWN ...

Page 13: ...CE LP 12 E3149X Top Left Angle Open Rack Stand 34 R1116A Manifold 13 T3051X Left Rack Support Open Rack Stand 35 S3228A Flange Bearing 4 14 T3052X Right Rack Support Open Rack Stand 36 S3231X Door Chain Assy Complete 15 T8075X Bottom Shelf w Hdwr Open Rack Stand 37 S3226A Door Chain Rod Short 16 R3180A 48 Burner Orifice Spud Nat 38 S3227A Door Chain Rod Long 17 R3175A 57 Burner Orifice Spud LP 39 ...

Page 14: ...69 70 71 72 74 75 75 75 73 76 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 16 ER B K S A ER B K S A I P E D RI P E D R w S r i o tc o h D 93 21 21 22 22 7 7 14 CO1 G Full Size Gas Convection Oven 864 963 3471 864 963 5316 800 927 6887 customerservice bkideas com fax US Canada web address PO Box 80400 Simpsonville SC 29680 0400 BKI WORLDWIDE Note When ordering ALWAYS specify Part Model Serial Volta...

Page 15: ...ter 26 E3095X Baffle Plate Bracket Assy 4 74 M1335X Bell Audiolarm 27 Q1414A Screw Hex Hd 10x3 4 8 75 S1311X Knob 3 28 E3481X Combustion Chamber Front Center 76 M1352X Ckt Breaker 120 240V 15A 29 E3482X Combustion Chamber Front Left 77 30 E3511X Combustion Chamber Front Right 78 M1356A Solid State Relay CE 31 E3471K Door Switch Actuator 79 M1145X Transformer 120V 24V 32 M1102X Microswitch Rotary 8...

Page 16: ...ONS Negligence or acts of God Thermostat calibrations after 30 days from equipment installation date Air and Gas adjustments Light bulbs Glass doors and door adjustments Fuses Adjustments to burner flames and cleaning of pilot burners Tightening of screws or fasteners Failures caused by erratic voltages or gas supplies Unauthorized repair by anyone other than a BKI Factory Authorized Service Cente...

Reviews: