
6
The following are recommended installation practices/procedures for the pump. If there
are questions in regards to your specific application, contact your local
BJM Pumps
distributor or BJM Pumps, LLC.
PRE-INSTALLATION INSPECTION
1) Check the pump for damage that may have occurred during shipment.
2) Inspect the pump for any cracks, dents, damaged threads, etc.
3) Check power cord for any cuts or damage.
4) Check for, and tighten any hardware that appears loose.
5) Carefully read all tags, decals and markings on the pump.
If anything appears to be abnormal, contact your
BJM Pumps
distributor or BJM
Pumps, LLC. If damaged, the pump may need to be repaired before use. Do not install
or use the pump until appropriate action has been taken.
Lubrication:
No additional lubrication is necessary. The shaft seal and bearings are fully lubricated
from the factory. Seal oil should be checked once per year. See table below.
OIL FILL QUANTITY/TYPE
Pump Models
Qty. oil in seal chamber
Type of oil
(U.S. fl. oz.) Metric C.C.
R100
9.5
280
ISO 32 NSF Food Grade Oil
R250, R400, R400D, R400P
1.35
40
ISO 32 NSF Food Grade Oil
R750, R1500, R1530, R1520
3.7
110
ISO 32 NSF Food Grade Oil
RX750SS, RX1500SS
4.4
130
ISO 32 NSF Food Grade Oil
R400L, R400L-3
4.4
130
ISO 32 NSF Food Grade Oil
R08, R15
3.7
110
ISO 32 NSF Food Grade Oil
RX08SS, RX15SS
4.4
130
ISO 32 NSF Food Grade Oil
Summary of Contents for R08
Page 2: ......
Page 16: ...16 EXPLODED VIEW OF R100...
Page 17: ...17 EXPLODED VIEW OF R250 R400 R400D R400P...
Page 18: ...18 EXPLODED VIEW OF R750 RX750SS R1500 RX1500SS R1520 R1530...
Page 19: ...19 EXPLODED VIEW OF R08 RX08SS R15 RX15SS...
Page 24: ...24 SINGLE PHASE WIRING DIAGRAM 115V 230V W O GOVERNOR SWITCH MODELS R100 R250 R400 R400D R400P...
Page 26: ...26 THREE PHASE WIRING DIAGRAM MODELS R08 RX08SS R15 RX15SS 230V...
Page 27: ...27 THREE PHASE WIRING DIAGRAM MODELS R08 RX08SS R15 RX15SS 460V...
Page 29: ...29...
Page 33: ...NOTES...