S9 Operator Board Maintenance Instructions
23
、
25M LCK Circuit
Above phenomenon
,
The mining machine has been running. 7 days
,
0 GH/S
(
Avg
)
And did not fall much
,
The description of the mine machine is the
time of failure. The speed of the double fan is very low
,
And the Temp Chip of the 8
th
chain is Very low
,
which is a board that's been dropped
before.
,
This type of phenomenon can normally be restarted. This phenomenon has a great relationship with the operating environment of the mining
machine, especially the ambient temperature; for example, in the winter in the north, the mining machine has a high probability of sudden cooling.
Also check the network of the mining machine to the mine pool connection is unblocked
?
This is also the case with external network instability.
If it doesn't work correctly after a reboot
,
using a test fixture to test the three operational plates of a mine machine as a single board
,
Detects if the operation
board is abnormal. And just update the latest firmware.
3
)
, drop line, less board, drop chip. Figure 24 Figure 25 Figure 26 is shown
:
24, the calculation of power Plate chip off phenomenon
13