6.

 

Remove the plugs from the threaded holes in the 

Ground 

Anchor 

(A). Unpack the 

Pole 

(B) and 

Crank 

(E). Align 

the hinge tabs on the 

Pole

 (B) with the hinge tube on the 

Ground  Anchor 

(A). Insert the  

1/2” 

X 6 

1/2” 

Hex Bolt 

(I) through the hinge tabs. Install the 

1/2”

-

13 

Deformed 

Lock Nut 

(J) and tighten it before backing off 1/2 turn or 

until 

Pole 

(B) can swivel on the 

Ground Anchor 

(A).   

See Figure 4.

 

7.

 

Lift 

Pole 

(B) to approximately 45° and install the 

3/4” 

7” 

Hex Bolt 

(K) through the slot in the back of the 

Pole 

(B) bottom plate and then through the slot in the back of 

the 

Ground Anchor 

(A) top plate. Hand tighten a 

3/4”

Hex Nut 

(L) onto the 

3/4” 

7” 

Hex Bolt 

(K). Make sure to tighten the 

3/4” 

Hex Nut 

(L) onto the 

3/4” 

7” 

Hex Bolt 

(K) until you see threads on the other side of the nut. See Figures 5 & 6.

 

Figure 4

 

Figure 7

 

Figure 5

 

Important! 

 

The 

3/4” 

7” 

Hex Bolt 

(K) and 

3/4” 

Hex Nut 

(L) MUST remain in place until 

Pole 

(B) is raised and 

bolted to the 

Ground Anchor 

(A) top plate.

 

8.

 

Lift the 

Lower Arm 

(C) over the top of the 

Pole 

(B). Align the holes in the 

Lower Arm 

(C) with the lower 

holes in the 

Pole 

(B). Attach the 

Lower Arm 

(C) to the 

Pole 

(B) with a 

5/8” 

12” 

Hex Bolt 

(O) and a 

5/8” 

Lock Nut 

(P). Tighten then back off 1/2 turn. 

Lower Arm 

(C) must pivot freely. See Figure 7.

 

Figure 6

 

Summary of Contents for PR98GHT

Page 1: ...r Hangtime Hangtime Pole System Ref 920444 Warning Improper installation maintenance or use may cause product failure and serious personal injury Two or three people in good physical condition and cap...

Page 2: ...the concrete cures Periodically re check the level of the Ground Anchor A in both directions as you add more concrete See Figures 2 3 3 Before pouring the concrete make sure you have the required tool...

Page 3: ...en through the slot in the back of the Ground Anchor A top plate Hand tighten a 3 4 Hex Nut L onto the 3 4 X 7 Hex Bolt K Make sure to tighten the 3 4 Hex Nut L onto the 3 4 X 7 Hex Bolt K until you s...

Page 4: ...en See Figure 9 11 Look at the table above to determine which instructions to follow for assembly of the Backboard X Figure 9 Backboard Required H Frame Package BA42GHT HT6HFRAME2 HT6072G PR98GHT BA42...

Page 5: ...top lip of Backboard H Frame Y Use 7 16 X 1 1 2 Carriage Bolts 1 7 16 Flat Washers 2 7 16 Lock Washers 3 and 7 16 Hex Nuts 4 in the top two holes of Backboard X and Backboard H Frame Y Hand tighten h...

Page 6: ...it with the bolt holes in the Lower Arm C Using a 5 8 X 12 Hex Bolt O and 5 8 Lock Nut P attach the Backboard X to the Lower Arm C Tilt the Backboard X up and attach it to the Upper Arms D with a 5 8...

Page 7: ...ackboard to raise the assembly to a vertical position Fasten the Pole B to the Ground Anchor A using the 5 8 X 1 1 2 Hex Bolts R and 5 8 Lock Washers S Start with 2 in the rear bolt holes Then install...

Page 8: ...y in place if you tighten the 1 4 20 X 3 Hex Bolt U you will also tighten the assembly against the Pointer G The Pointer G must rotate freely on the 1 4 20 X 3 Hex Bolt U once installed to accurately...

Reviews: