19
Enter S4 mode For 1/5/10/30/60/120 Minutes Then To Do Wake Up Test.
Pass
Wake Up By LAN Test
Pass
Wake Up By Ring Test
Pass
Enable Scheduled Task Runs at Specified time Test (RTC wake up)
Pass
Device Comparability Test
---
PS/2 Connector Test
---
PS/2 Keyboard Test
Pass
PS/2 Mouse Test
Pass
COM Port Test
---
Add Serial Mouse PnP Test
Pass
Add Modem PnP Test
Pass
Print Port Test
---
Add Printer PnP Test
Pass
FDD Connector Test
---
Format 1.44 Floppy Driver
Pass
IDE Connectors Test
---
Ultra DMA 33 Hard Disk Test
Pass
Ultra DMA 66 Hard Disk Test
Pass
Ultra DMA 100 Hard Disk Test
Pass
CD-ROM Test
Pass
DVD-ROM Data Read Test
Pass
ZIP Device Driver Test
Pass
Format ZIP Driver With Floppy A Type
Pass
LS120 Device Driver Test
Pass
PCI Slots Test
---
Add SCSI Card Test
Pass
Add LAN Card Test
Pass
Wake On LAN Test (Standby Mode)
Pass
Add Token Ring LAN Card Test
Pass
Add Sound Card Test
Pass
Add Modem Card Test
Pass
Wake On Modem Test (Standby Mode)
Pass
CNR Slots Test
---
Add Modem Card Test
Pass
VGA Function Test
---
VGA Drivers Setup Installation Test
Pass
Display Properties Information Review
Pass
VGA Resolution All Test
Pass
Screen Saver Test
Pass
Check Screen Have No Any Shadow Or Garbage
Pass
Playing MPEG Files Test
Pass
Playing VCD Test
Pass
Playing DVD Test(With WinDVD 2000)
Pass