background image

4.  Getting started 

4.1. 

Unpacking

. Remove packing materials carefully and retain them for future shipment 

or  storage  of  the  unit.  Examine  the  unit  carefully  for  any  damage  incurred  during 
transit. The warranty does not cover in-transit damage. Warranty covers only the units 
transported in the original package. 

4.2. 

Complete set

. Package contents: 

4.2.1.  Standard set 

PSU-2T Mini-Shaker for Immunology with IPP-2 platform 

 ............................ 1 pce 

external power supply ....................................................................................... 1 pce 

Operating Manual; Certificate .......................................................................... 1 copy 

4.2.2.  Optional accessories 

IPP-4 platform for 4 immunoplates 

 ........................................................ on request 

 

 

 

 

IPP-2 

IPP-4 

4.3. 

Setup. Place the unit on the horizontal even working surface. Remove protective film 
from the display. Plug the external power supply into the 12 V socket at the rear side 
of the unit. 

4.3.1.  Install the platform to the movable base by inserting the pins on the underside of the 

platform into the holes on the supporting platform on the movable base. 

 

 

Summary of Contents for PSU-2T

Page 1: ......

Page 2: ...2...

Page 3: ...formation 5 4 Getting started 6 5 Operation 7 6 Specifications 8 7 Maintenance 8 8 Warranty 9 9 EU Declaration of conformity 10 1 About this edition of operating manual The current edition of operatin...

Page 4: ...ply provided with this product Ensure that the external power supply is easily accessible during use Disconnect the unit from the mains before moving Turn off the unit by disconnecting the external po...

Page 5: ...n stop mode up to 7 days and over 2 years of trouble free operation are guaranteed due to direct drive mechanism and brushless motor PSU 2T Mini shaker provides Gentle shaking of samples Smooth regula...

Page 6: ...t PSU 2T Mini Shaker for Immunology with IPP 2 platform 1 pce external power supply 1 pce Operating Manual Certificate 1 copy 4 2 2 Optional accessories IPP 4 platform for 4 immunoplates on request IP...

Page 7: ...Press the Run Stop key fig 1 2 The platform will start shaking and the timer will start counting the operation time The display shows actual time less than 1 hour in minutes and seconds mm ss after 1...

Page 8: ...aximum load 0 3 kg 6 6 Dimensions 220x205x90 mm 6 7 Input current power consumption 12V 280mA 3 4W 6 8 External power supply in AC 100 240V 50 60Hz out DC 12V 6 9 Weight1 2 0 kg Optional accessories D...

Page 9: ...obtain the claim form visit section Technical support on our website at link below 8 5 Extended warranty For PSU 2T the Basic Plus class model extended warranty is a paid service Contact your local Bi...

Page 10: ...EU WEEE 2012 19 EU Applicable Standards LVS EN 61326 1 2013 Electrical equipment for measurement control and laboratory use EMC requirements General requirements LVS EN 61010 1 2011 Safety requirement...

Page 11: ...11...

Page 12: ......

Reviews: