6
4. Getting started
4.1.
Unpacking
. Remove packing materials carefully and retain them for future shipment
or storage of the unit. Examine the unit carefully for any damage incurred during
transit. The warranty does not cover in-transit damage. Warranty covers only the units
transported in the original package.
4.2.
Complete set
. Package contents:
4.2.1. Standard set
-
PSU-2T Mini-Shaker for Immunology with IPP-2 platform
............................ 1 pce
-
external power supply ....................................................................................... 1 pce
-
Operating Manual; Certificate .......................................................................... 1 copy
4.2.2. Optional accessories
-
IPP-4 platform for 4 immunoplates
........................................................ on request
IPP-2
IPP-4
4.3.
Setup. Place the unit on the horizontal even working surface. Remove protective film
from the display. Plug the external power supply into the 12 V socket at the rear side
of the unit.
4.3.1. Install the platform to the movable base by inserting the pins on the underside of the
platform into the holes on the supporting platform on the movable base.