2 Check before Startup
The following contents should be confirmed before power on:
1 Whether the power supply meets the required voltage of the instrument;(see chapter 2 of this
document for power requirements)
2 Confirm that the power cord plug has been reliably inserted into the power socket;
3 Reliable grounding of power cord;
4 Whether the 96 deep well plates is in place.
3 Placement of 96 deep well plate
a
)
There are four heating blocks placed on each plate with a limit block on each side to assist in
positioning, and a spring plate on each side to help fix the 96 deep well plate.
b
)
Note: Make sure the 96 deep well plate is placed evenly before starting up.
4 Startup
Switch on the automatic nucleic acid purification system, and the instrument will conduct self-test.
Self-test takes about 10 seconds. Please wait patiently. If no problem is found in the self-test, the main
menu will appear on the screen, and then the user can edit, review, modify and delete files.
①
Case Body
②
Display
③
Operating room
④
Where 96 deep well
plate is placed
⑤
Closing cover
⑥
Power switch
⑦
Standard power
outlet
⑧
USB interface
⑨
Sticker
Caution:
The fuse seat is fitted with a fuse for which the requirement is: F 250V 6A
5
20.
Fuses must be replaced using products that meet the requirements. Contact the supplier or
manufacturer for fuses.