Water scheme example
Considerations to take into account in the installation of plumbing:
•
Place a shut-off valve to all machines.
•
Place a draining shut-off valve to prevent accumulation of water in winter and
freezing problems.
•
Make use of a shut-off valve for each installed unit and be able to cut the supply
in specific equipment.
•
Use polyethylene pipe diameter corresponding to water supply connections.
•
Entry to the evaporative will be 1/2” and the electrovalve located before the
evaporative will be a 3/4” female input and output.
•
Check if the supply pressure is the necessary for supplying the full installation.
•
Checking the plumbing connection of the entire installation to avoid losses and
leaks that can cause damage.
CONNECTION DIAGRAMS
MODELO
WIRING TYPE
BIO-18D
3 wires of 2,5 mm2 section (10 A)
BIO-30D
Three-phase cable(N+3F+Ground)
Connection diagram example