
UV_SN-GB.doc
Copyright BIO-UV - 29/09/2008
Marque, Modèles et Brevets déposés - Produits exclusifs
Page 6
C.
WARNINGS AND SAFETY
BIO-UV reactors are ready to install, no works is required inside the reactor.
Read all the instructions in this manual before switching on the BIO-UV appliance.
INSTALLATION
RECOMMANDATIONS
The reactor must be installed:
-
in a technical room, protected from light and rain,
-
after the filter(s),
-
in a dry zone, ambient humidity must be < 80%.
The installation zone temperature
must be within 0°C and 40°C.
Keep any sources of hydrochloric acid vapours away from the installation.
The electrical unit should be positioned:
-
so that it is protected from water,
-
at eye level.
The air vent
of fan must not be obstructed.
The cable length
between the UV reactor and its electrical unit
must not be modified.
Make sure you choose a position where the lamp can be taken out
: the AVAILABLE HEIGHT
should be double
the total height of the appliance.
M
The equipment must always be filled with water when operating
and the
air must be bled out of it.
We recommend the presence of a by-pass.
M
Before accessing the connection terminals, ensure that all supply circuits
are disconnected.
M
The reactor installation as a whole must be protected with a
suitably adapted
circuit breaker.
(See A. Technical characteristics)
M
Check that cable complies with legislation and the required power level.
(See A. Technical characteristics)
M
If, for installation reasons, the power supply cables connecting the cabinet to
the reactor have to be shortened,
take care to fully crimp the new end fittings
at each end of the cables.