IMPORTANT SAFETY NOTICES

ALWAYS BE ON THE SAFE SIDE – IMPORTANT SAFETY TIPS

This building should be constructed by at least two adults.

- Do not use this product if it has been modified or damaged.
- Allow adequate time to complete construction.  If you hit any snags, take a break, keep calm, and seek additional help if 

necessary.

- Make sure that there is adequate space around the construction site to enable access to all sides of the building during 

construction.

- Do not attempt to construct the building in strong winds or poor weather conditions.
- Make sure that any ladders used during construction are in a good condition and that all tools are in good working order.
- The building is not completely stable until construction is complete and the roof of this building is not intended to 

support significant weight.  

Do not climb on the roof.

- Keep bags, nails and fixings out of the reach of children.

Due to the nature of wooden panel products please watch out for the following minor blemishes:

- Protruding nails = hammer in the nails so that they are flush with the wood’s surface.
- Splintered wood = smooth down with sandpaper.
- Loose or dead knots = use a non-toxic wood glue to secure.
- Wear protective gloves and robust clothes during construction.
- Make sure that any paint or preservative that you use is non-toxic and complies with EN71 regulations.
- Perform periodical checks throughout the life of the building to ensure that the original condition is maintained.
- Construct your building within a month of delivery to reduce the chances of the panels / boards warping.

PRODUCT WARRANTY

- If there is any cause for concern or any other problems are found on or after delivery, such as damaged parts 

DO NOT

BUILD

, please contact the customer Support Centre - 

www.gardenbuildingsdirect.co.uk/help for further advice and

resolution and stop all use before  assembly until issues are resolved.

IMPORTANT:

 

 Throughout the life of the building please conduct checks to ensure the original condition is maintained.

- It is advised that the building is checked over prior to use each and every time.

- Please check the structural integrity of the building.

- Ensure the hinges of the door(s) are still in good working order regularly.

- Check the whole of the building for splintering. If this occurs please sand down the problem area and re-treat.

building 

- Please ensure that any cracks that should appear in the product are not situated on any joints.

- Cleaning of the building on a regular basis is advised to increase longevity.

MAINTENANCE

- Products are built to the highest quality standards and should provide a fantastic addition to your garden for  years to 

come, this of course being subject to reasonable use, care and transportation.

     

    

GENERAL RECOMMENDATIONS

Thank you for purchasing this building.  We hope you will be delighted with your new building for many years to come.  

These instructions have been written as a guide to assembling this building and will provide you with an overview of 

the process of constructing this building.  There are a number of considerations to be thought of before constructing 

the building and how to maintain your building upon completion.  This section is also aimed at ensuring you are aware 

of considerations such as: location for construction, treatment of the building and construction information. 

PLASTIC GLAZING: 

The glazing is generally bound with a holding band and may look like one thick piece when delivered. It 

REMOVE PROTECTIVE 

FILM FROM ALL GLAZING BEFORE USE

.  The glazing is safer to use than glass and is an economic solution for garden 

building use, but must be installed correctly, carefully and safely. The glazing on all the garden buildings does not make 

the windows water tight and we suggest using a silicon sealant to improve water resistance around the edges of the 

glazing.

DOORS & WINDOWS:

the doors and windows before requesting a copy from the retailer from which you purchased the building.

AFTER MARKET MODIFICATION

- We do not recommend modifying this product. However, customers do enjoy modifying their buildings with their own 

specific needs in mind as our products allow for a wide range of uses. 

- If you modify this product for your own personal requirements you are doing so at your own risk.
- Customers who modify their buildings should make sure to do so safely and so that they do not affect the integrity of 

the structure.

- If you are thinking of modifying this building be aware that any modifications invalidate your warranty and may affect 

your consumer rights.

  

- If in doubt about the product’s limitations please read and understand all of the instructions and guidance notes.  If

necessary please contact the retailer that the item was purchased from.

    

- Please contact the retailer from which the product was purchased from for warranty and guarantee information.
- PLEASE NOTE: The warranty does not extend to damage caused by post-purchase transportation, careless handling or

- Treat your building annually with a quality timber treatment to comply with the buildings warranty.

BUILDING LOCATION & CONSTRUCTION: 

It is very important that a solid and level foundation is prepared to ensure the building will be level and square. 

 This will 

building will only occur on completion of the construction process. 

We recommend that you construct your building 

within 1 month of delivery as the timber may begin to warp. 

TREATMENT: 

Treating the product when assembled is essential to ensure the building will not deteriorate.  We 

IMPORTANT NOTICE: 

The natural moisture content of wood will change according to season.  We recommend 

 

TOOLS REQUIRED:

 - Drill with 4.5, 3 and 2mm drill bit / Hammer / Spirit Level / Measuring Tape / Screwdriver (Phillips) / 

Stanley Knife / Wood Saw / Step Ladder. 

PLEASE NOTE:  You are advised to pilot drill all screw holes and ensure all screwheads are countersunk.

   

CUSTOMER SERVICE: 

If there are any queries regarding the building construction or aftercare please contact the 

supplier of the building who will do their upmost to ensure customer satisfaction.

    

ADDITIONAL SAFETY RULES AND GUIDELINES:

- No one should use the equipment until properly assembled.

- Read the instructions thoroughly a couple of times before attempting each section of the build.
- Take your time, do not panic.

- Construct your building within one month of delivery to stop parts warping / bowing.

     

GARDEN BUILDINGS: 

THESE PRODUCTS ARE INTENDED FOR DOMESTIC AND OUTDOOR USE ONLY. 

which  is  a  natural  process. 

The  timber  may 

crack  naturally  over  time,  but  will  not  affect 

the  structural  integrity  of  the  building 

provided  it  has  been  assembled  as  advised. 

Keep  pannels  and  your  building  away  from 

extreme  temperatures  and  away  from  trees, 

fences  and  other  high  moisture  containing 

elements  to  reduce  and  help  prevent 

warping.

WOOD CHARACTERISTICS:

 Wood is a natural material, which means that no two boards on your building will be identical 

and will expand and contract due to moisture levels. This natural affect of expansion and contraction is inevitable and is 

compensated for by the tongue and groove buildings. The timber in overlap buildings may warp and twist over time, 

DOUBLE GLAZING: 

Double Glazed buildings will be pre-glazed and ready to hang. Please be careful handling the doors 

and  windows.  Store  in  a  safe  place  until  the  cabin  is  erect.  Fix  the  doors  and  windows  using  the  Door  and Window 

Assembly Instructions.

For Queries and Help please call Product Support:

 

01

909 768 858

Summary of Contents for INS-0051

Page 1: ...You Start V3 2 240120 Please note that all images are for illustration purposes only 2 Read the instructions thoroughly and then re read if necessary 1 Reacquaint yourself with the parts on the Tech Document TECH DETAILS 3 Group all boards by Walls Floor Roof together first to make assembly easier Ensure all parts are there before assembly 4 We recommend to paint boards after assembly to get the b...

Page 2: ...stalled correctly carefully and safely The glazing on all the garden buildings does not make the windows water tight and we suggest using a silicon sealant to improve water resistance around the edges of the glazing DOORS WINDOWS the doors and windows before requesting a copy from the retailer from which you purchased the building AFTER MARKET MODIFICATION We do not recommend modifying this produc...

Page 3: ...walk around simply adding the next board This will save no end of time PRODUCT MAINTENANCE CHECK LIST Level Base maintaining the building Seal The Windows Use a silicone sealant on the inside and outside of the windows as soon as possible after assembly is a strong way of sealing the windows Annually Treat The Building Treat your building after construction with a good quality water resistant trea...

Page 4: ...ent this happening see Fig C The following rule generally applies Excessive dry conditions can cause board shrinkage Excessive wet conditions can cause board expansion Fig C We suggest that removing all the vertical framing temporarily will allow the building to re settle and find its natural level This includes all items holding the vertical height Framing Window and Doors Frames etc as well as a...

Page 5: ...0 1 9 0 9 7 6 8 8 5 8 ...

Page 6: ...0 1 9 0 9 7 6 8 8 5 8 ...

Page 7: ... x D3 0m Shown please refer to tech details for specific building Wall B Optional Floor T G Windows Double Door DD Wall D Wall E Roof Felt Comes in roll s Roof Assembly T G RA Wall C Finial FI Wall A Purlins PU Fascia Board FB ...

Page 8: ... x D4 0m Shown please refer to tech details for specific building Wall B Optional Floor T G Windows Double Door DD Wall D Wall E Roof Felt Comes in roll s Roof Assembly T G RA Wall C Finial FI Wall A Purlins PU Fascia Board FB ...

Page 9: ...UHZ WKH ZDOO ERDUGV Front Back S50 x 6 28 35 44mm Bearer Layout Front Back W4 0 x D3 0m shown Use Web Details for more detailed layout 75PT 75PT 75PT 75PT 75PT 75PT 69 5 cut from Front Bearer Build up the walls of the cabin in this order Side Center Wall Boards then Front and Back Boards 28 35 44mm Floor Assembly Front Back W4 0m x D3 0m Floors in 1 as shown Front Back Ensure the notches are inter...

Page 10: ...DOO ERDUGV 28 35 44mm Floor Assembly Front Back W4 0m x D4 0m Floors in 2 as shown N40 28 35 44mm Floor Assembly XW RXW WKH ODVW ȵRRU ERDUG WR ȴW RQ FRUQHU RI WKH ZDOO ERDUGV Build up the walls of the cabin in this order Side Center Wall Boards then Front and Back Boards Pile up atleast 4 Wall Boards before ȴWWLQJ WKH LQGRZ IUDPH 3ODFH DQG ȴ WKH ȵRRU ERDUGV XVWRPHU FXWV RXW N40 28 35 44mm Floor As...

Page 11: ...ȴ S70 x 2 Gable Top 6OLGH DQG ȴW WKH LQGRZ UDPH RQWR WKH DOO RDUGV 3ODFH DQG ȴ WKH ODVW ZDOO ERDUG RQ WRS RI IURQW GRRU ZDOO W4 0m x D3 0m only using BV Boards S50 x 4 3ODFH DQG ȴ WKH ODVW ZDOO ERDUG RQ WRS RI IURQW GRRU ZDOO W4 0m x D4 0m only using D Boards S50 x 4 Repeat previous stage of Gable top assembly S70 x 4 Gable Top 13 16 17 18 14 15 ...

Page 12: ...length required Requires cutting to size Line up the external Eaves Framing on top of front wall boards use 3 x S50 per frame S40 x 14 Roof Assembly S40 x 12 S40 Continue placing the 5RRI ERDUG DQG ȴ ZLWK VFUHZ Roof Assembly Repeat previous stage for this side S50 EF 02 Check the Tech Details for the length required Requires cutting to size 19 22 23 24 20 21 ...

Page 13: ...oor Threshold to the front of the Floor S30 x 6 BB 01 x 2 2054mm Line up Top Door Framing and pushed up tightly to the wall boards S50 x 4 Line up the Door Side Framing ensure top and bottom distance is 1560mm S50 x 4 1560mm 1560mm Line up Side Door Framing and pushed up tightly to the wall boards S50 x 4 25 28 29 30 26 27 ...

Page 14: ...ng in the UDPH DQG ȴW WKH EHDGLQJ around the edges DUGERDG FDQ EH XVHG WR SURWHFW WKH JOD LQJ ZKHQ ȴWWLQJ WKH HDGLQJ Fixing Window Glazing Modern Fix the Window Rebate to the side of the inside of Window frame PP x 12 WR x 2 x 2 656mm 1197mm S30 x 6 CS x 1 7KH DVHPHQW 6WD MRLQW ȴWV centrally to the opening window 2 people will be required for this Fixing Opening Window S25 x 6 Fit the Opening Wind...

Page 15: ...DGLQJ Fixing Door Glazing Modern S30 x 4 LW DQG ȴ WKH LQGRZ ODWFK ȴ LQJ KDOI ZD RQ WKH ZLQGRZ Window Latch Fixing 2mm Gap S30 x 12 S25 x 4 Align Door Lock Handle over the key hole on the inside of 0DLQ RRU 7KH ORFN ȴWV FHQWUDOO to the frame Fixing the Door Lock Handle x 1 PP x 36 GL x 1 Place the Glazing in the UDPH DQG ȴW WKH EHDGLQJ around the edges DUGERDG FDQ EH XVHG WR SURWHFW WKH JOD LQJ ZKH...

Page 16: ...oor S30 x 4 CSP x 1 1850mm Fix the Door Cloaking Strip on the side of frames on each side PP x 16 DR DR x 2 x 2 1560mm 1854mm S40 x 8 FR 01 x 2 1990mm Fixing Wall Framing S40 x 3 EC 03 x1 1732mm Place the Eaves Cloaking Trim on the roof boards and wall boards meet 7KHQ ȴ LQWR SODFH FR 01 x 2 1990mm Fixing Wall Framing S40 x 8 43 46 47 48 44 45 ...

Page 17: ...1909 768 858 FR F5 x 1 1646mm S40 x 3 FR F3 x 2 1873mm S40 x 6 S40 x 6 EF 02 x2 1916mm Repeat previous stage for ȴ LQJ WKH DYHV ORDNLQJ WULP S40 x 6 FR F4 x 2 1290mm S40 x 2 FR F6 x 1 200mm S40 x 8 FR 02 x 2 2080mm Fixing Wall Framing 49 52 53 54 50 51 ...

Page 18: ...tails for dimensions S40 x 8 FR 02 x 2 2080mm Fixing Wall Framing Felt Fixing W4 0m x D3 0m Length of roof 140mm x 4 FrontView 3 0m Gables 4 PIECES OF FELT Felt Felt Felt Felt Felt Fixing W4 0m x D4 0m Length of roof 140mm x 5 FrontView 4 0m Gables 5 PIECES OF FELT Felt Felt Felt Felt Felt S40 x 3 EC 01 x1 2054mm Place the Eaves Cloaking Trim on the roof boards and wall boards meet 7KHQ ȴ LQWR SOD...

Page 19: ... for this side T10 Tack to hold in place 70mm overhang at each end Fold over Eaves T10 Repeat previous stage to complete the roof felt covering For Shingles Roof Covering Only Only 1 roll of felt is used as a starter layer for the Shingles Cut the full roll of felt in half lenght ways x 1 100mm T10 61 64 65 66 62 63 ...

Page 20: ... that come with the packs For Shingles Roof Covering Only N30 x 6 FB 01 x 4 1646mm Facia Fixing Stage 100mm For Shingles Roof Covering Only N30 x 6 SF 02 x 4 1624mm Side Weather Fixing Stage N30 x 4 x 2 3LORW GULOO KROHV ȴUVW N30 x 6 SF 01 x 4 Barge Board Fixing Stage 2054mm 67 70 71 72 68 69 ...

Page 21: ... 3 for the required building maintenance for the seasonal timber movement Protect your building PP P P 6HDWWOH RPH 2ɝFH RXEOH RRU Please refer to page 3 for the required building maintenance for the seasonal timber movement Protect your building PP P P 6HDWWOH RPH 2ɝFH RXEOH RRU 73 74 ...