background image

 

13 

 

BIJUR DELIMON INTERNATIONAL 

BA_2017_1_GB_PVB

 

 

  9. 

ACCESSORIES 

Close / open of outlets 

 DESCRIPTION 

ORDER 

NO. 

MATERIAL 

 

Plug screw + clamp ring mounting 

741611851 

steel ZnNi 

 

Clamp ring 

735113223 

brass 

 

Plug screw M10x1 

741615741 

steel ZnNi  

 

Sealing DIN 7603 - A 10x13,5 

727121094 

copper 

 

Ball 

71961

4114

 

 

 

Headless pin 

741072644 

 

 

 

Accessories for manual lubrication / emergency lubrication 

 

DESCRIPTION

 

ORDER NO. 

MATERIAL 

 

 

High pressure grease nipple, tapered DIN 71452 – A G 1/8“ for 
divider inlet 

736831514 

A3C 

 

T-piece 1/8“ BSP 
 

73449V066 

A3C 

 

Additional accessories like manual grease guns, hoses and fittings you can find within our brochure “Lubrication Assistance”.  

 

 

 

 

 

10. 

ASSEMBLY,  INSTALLATION  AND  COMMISSIONING 

WARNING 

Assembly of the PVB distributor may only be carried out by qualified personnel. An appropriate commercially available tool 
must be used to assemble the pipelines and cutting ring fittings. 
Please contact our service department if necessary. We can provide service engineers or supervisors for assembly, training 
and induction – either at a flat rate or invoiced per day. 
 
Installation position and mounting: 
The progressive distributor is mounted by means of two mounting holes Ø 7, preferably with M 6 x 40 hexagonal bolts and 
washers. The mounting bolts are not normally included in delivery and must be ordered separately if required (see table on 
page 13). 

o

 

The PVB distributor can be fitted in any mounting position without limitations. 
The side with the engraved outlet numbering should face upwards (to be 
permanently visible). The pipeline ports are thus on the upper side, which makes 
it easier to fit the pipes. 

o

 

The distributor must be mounted in a stress-free position on a flat surface. 

o

 

Weld-on plates (optionally available) must only be welded on without the distributor fitted. 

 
 
 

 

 

 

to open 

c-connection 

to close b–connection 

or outlet 

 

to close b-connection 

Summary of Contents for PVB series

Page 1: ...1 BIJUR DELIMON INTERNATIONAL BA_2017_1_GB_PVB Operating manual Progressive Block Distributor PVB BA_2017_1_GB_PVB...

Page 2: ...ion for competition purposes Company address spare parts and service address DELIMON GmbH Arminstra e 15 D 40277 D sseldorf Phone 49 211 7774 0 Fax 49 211 7774 210 Branch office Am Bockwald 4 D 08344...

Page 3: ...has to take care that all the maintenance inspection and installation work is executed by authorized and qualified skilled personnel who have informed themselves adequately by thoroughly studying the...

Page 4: ...ND FUNCTION PVB distributors are piston distributors which evenly distribute the supplied lubricant This is achieved by means of metal sealing pistons which dispense the lubricant to the connected lub...

Page 5: ...outlets or outlets that are opposite each other in order to achieve a higher metered volume for individual outlets for example WARNING Special fittings with non return valves similar to DIN 2353 CLL...

Page 6: ...modification of the outlets is listed in Chapter 9 Accessories Monitoring The PVB distributor can be fitted with a motion indicator on the last outlet pair for visually monitoring the piston movement...

Page 7: ...valves Suitable lubricants based on mineral oil Grease NLGI class 000 to 2 DIN 51818 Oil ISO VG 68 to 1500 operating viscosity DIN 51519 Synthetic lubricants on request The NLGI class as per DIN 5181...

Page 8: ...reversal yes Supply line short circuit protection no Circuit diagram and dimensions Electrical monitoring 76925N018 pressure resistant version 350 bar Type of protection IP 67 Operating voltage 10 to...

Page 9: ...ght connection open E right outlet open left closed CA c left connection open F both outlets closed CC c connections open on both sides G both outlets closed BC b connection and c right connection ope...

Page 10: ...factor is only the pumping capacity and its distribution over the PVB distributor as the following example shows Pumping capacity 12 cm3 min Distributor configuration 1 3 x 0 4 cm3 Distributor config...

Page 11: ...lubrication quantity over several intervals e g 2x per hour Further details on the mode of operation and control of progressive systems can be found in the general description of the system We are ha...

Page 12: ...ding 03 has to order separately if stainless steel of plug in fittings is required The number of fittings depends on the number of outlet selection not suitable for 350 bar version Assembly anf fittin...

Page 13: ...e used to assemble the pipelines and cutting ring fittings Please contact our service department if necessary We can provide service engineers or supervisors for assembly training and induction either...

Page 14: ...oning o Ensure that the distributor and all the connected pipes are correctly installed before you operate the distributor and lubrication system o Ensure that the pump that is connected cannot exceed...

Page 15: ...ting procedure 1 Make sure that the pump is supplying lubricant Remove the inlet fitting on the PVB distributor and let the pump run until lubricant comes out of the open line If there is no supply of...

Page 16: ...type Application FZ A or FZ B Pump three phase motor 8 15 30 litre container up to 200 bar up to 12 outlets robust design for harsh industrial environment for specific requirements for motors power s...

Reviews: