SECTION 3
PLANNED MAINTENANCE
3-1. GENERAL.
Planned maintenance consists of periodic visual and
operational checks, parts inspection, lubrication, and
scheduled maintenance designed to prevent or
discover malfunctions and defective parts. The
operator performs the checks in
and
refers any required servicing to a qualified mainte-
nance technician who performs the scheduled mainte-
nance and any required servicing.
3-2.
MONTHLY AND QUARTERLY CHECKS
is a monthly and quarterly inspection and
service chart based on normal usage of equipment
eight hours per day
,
five days per week
.
If the lift
truck is used in excess of forty hours per week,
the frequency of inspection and service should be
increased accordingly
.
These procedures must be
performed by a qualified service technician or your
EP Service Representative.
3-3. BATTERY CARE
3-3.1. General
The PDSR may be equipped with maintenance free
or industrial wet cell batteries.
The care and maintenance of the battery is very
important to obtain efficient truck operation and
maximum battery life.
CAUTION:
Gases produced by a battery can be
explosive. Do not smoke, use an open
flame, create an arc or sparks in the
vicinity of the battery. Ventilate an
enclosed area well when charging.
CAUTION:
Batteries contain sulfuric acid which may
cause severe burns. Avoid contact with
eyes, skin or clothing. In case of contact,
flush immediately and thoroughly with
clean water. Obtain medical attention
when eyes are affected. A baking soda
solution (one pound to one gallon of wat-
er) applied to spilled acid until bubbling
stops, neutralizes the acid for safe hand-
ing and disposal.
Leakage voltage from battery terminals to battery
case can cause misleading trouble symptoms with
the truck electrical system
.
Since components of
the truck electrical system are insulated from truck
frame, leakage voltage will not normally affect truck
operation unless a short circuit or breakdown of
circuit wire insulation to truck frame occurs.
A voltage check from battery connector terminal
to battery case should indicate near zero volts.
Typically, however
,
the sum of the voltages at both
terminals will equal battery volts. This leakage
voltage will discharge the battery. As battery
cleanliness deteriorates
,
the usable charge of the
battery decreases due to this self discharge.
Although a leakage voltage reading of zero volts
may not be possible, a cleaner battery will have
more usable charge for truck operation and not affect
operation of electronic devices on the unit.
Table 3-1
Monthly and Quarterly Inspection and Service Chart
VISUAL CHECKS
INTERVAL
INSPECTION OR SERVICE
Monthly
Check electrical brake for proper operation.
Monthly
Check load wheels for wear
.
A poly load wheel must be replaced if worn to within 1/16 inch
of hub. Check for separation from hub.
Monthly
Check drive wheel for wear
.
A poly drive wheel must be replaced if worn to within 3/4 inch
of hub. Check for separation from hub.
Monthly
Inspect wiring for loose connections and damaged insulation.
Monthly
Inspect contractors for proper operation.
Monthly
Check deadman brake switch for proper operation.
Monthly
Check lift chain tension, lubrication & operation (see paragraph 3-6.)
Quarterly
Check lift cylinder for leakage.
Quarterly
Check for excessive jerking of steering arm when stopping or starting.
Semi-annually
Inspect for chain wear (See SECTION 8)
Summary of Contents for PDSR 30
Page 2: ......
Page 8: ...1 4 BL PDSR 30 0319 03 07 2019 NOTES ...
Page 11: ...BL PDSR 30 0319 03 07 2019 2 3 Figure 2 2 Sample of Operator Check List R3815 ...
Page 14: ...2 6 BL PDSR 30 0319 03 07 2019 NOTES ...
Page 35: ...BL PDSR 30 0319 03 07 2019 4 17 Figure 4 2 Wiring Diagram R8126 ...
Page 36: ...4 18 BL PDSR 30 0319 03 07 2019 NOTES ...
Page 38: ...5 2 BL PDSR 30 0319 03 07 2019 Figure 5 1 Control Head Assembly DR_0007 ...
Page 39: ...BL PDSR 30 0319 03 07 2019 5 3 Figure 5 2 Steering Arm DR_0006 ...
Page 42: ...6 2 BL PDSR 30 0319 03 07 2019 NOTES ...
Page 47: ...BL PDSR 30 0319 03 07 2019 8 3 Figure 8 2 Telescopic Mast Assembly DR_0029 ...
Page 49: ...BL PDSR 30 0319 03 07 2019 8 5 Figure 8 3 Trimast Assembly DR_0014 ...
Page 50: ...8 6 BL PDSR 30 0319 03 07 2019 NOTES ...
Page 53: ...BL PDSR 30 0319 03 07 2019 9 3 Figure 9 1 1 Hydraulic Lines for Telescopic Mast DR_0033 ...
Page 54: ...9 4 BL PDSR 30 0319 03 07 2019 Figure 9 2 Hydraulic Lines for Trimast Lift Cylinder DR_0021 ...
Page 55: ...BL PDSR 30 0319 03 07 2019 9 5 Figure 9 2 1 Hydraulic Lines for Trimast DR_0022 ...
Page 61: ...BL PDSR 30 0319 03 07 2019 9 11 Figure 9 8 Hydraulic Lines for Reach Assembly DR_0023 ...
Page 62: ...9 12 BL PDSR 30 0319 03 07 2019 Figure 9 9 Telescopic Reach Assembly DR_0030 ...
Page 63: ...BL PDSR 30 0319 03 07 2019 9 13 Figure 9 10 1 Trimast Reach Assembly DR_0015 ...
Page 65: ...BL PDSR 30 0319 03 07 2019 9 15 Figure 9 12 Telescopic System DR_0028 ...
Page 66: ...9 16 BL PDSR 30 0319 03 07 2019 Figure 9 13 Trimast System DR_0013 ...
Page 68: ...9 18 BL PDSR 30 0319 03 07 2019 NOTES ...
Page 70: ...10 2 BL PDSR 30 0319 03 07 2019 DR_0009 ...
Page 71: ...BL PDSR 30 0319 03 07 2019 10 3 Figure 10 1 Electrical System DR_0010 ...
Page 72: ...10 4 BL PDSR 30 0319 03 07 2019 Figure 10 2 Control Panel Assembly DR_0011 ...
Page 74: ...10 6 BL PDSR 30 0319 03 07 2019 NOTES ...
Page 76: ...11 2 BL PDSR 30 0319 03 07 2019 NOTES ...
Page 78: ...12 2 BL PDSR 30 0319 03 07 2019 Figure 12 1 Frame DR_0001 ...
Page 80: ...12 4 BL PDSR 30 0319 03 07 2019 Figure 12 2 Cover Assembly DR_0002 ...
Page 82: ...12 6 BL PDSR 30 0319 03 07 2019 Figure 12 3 Battery Compartment DR_0003 ...
Page 92: ...12 16 BL PDSR 30 0319 03 07 2019 Figure 12 8 Steering Arm DR_0006 ...
Page 94: ...12 18 BL PDSR 30 0319 03 07 2019 Figure 12 9 Control Head Assembly DR_0007 ...
Page 96: ...12 20 BL PDSR 30 0319 03 07 2019 Figure 12 10 Hydraulic System DR_0008 ...
Page 98: ...12 22 BL PDSR 30 0319 03 07 2019 Figure 12 11 Triple Solenoid Valve DR_0045 ...
Page 100: ...12 24 BL PDSR 30 0319 03 07 2019 Figure 12 12 Pump and Motor Assembly DR_0037 ...
Page 102: ...12 26 BL PDSR 30 0319 03 07 2019 Figure 12 13 Electrical System DR_0009 ...
Page 104: ...12 28 BL PDSR 30 0319 03 07 2019 Figure 12 14 Proportional Valve Circuit Board DR_0039 ...
Page 106: ...12 30 BL PDSR 30 0319 03 07 2019 Figure 12 15 Control Panel Assembly DR_0010 ...
Page 108: ...12 32 BL PDSR 30 0319 03 07 2019 Figure 12 16 Wiring Harness DR_0011 ...
Page 110: ...12 34 BL PDSR 30 0319 03 07 2019 Figure 12 17 Travel Alarm Wiring Harness DR_0041 ...
Page 112: ...12 36 BL PDSR 30 0319 03 07 2019 Figure 12 18 Cable Assembly DR_0012 ...
Page 114: ...12 38 BL PDSR 30 0319 03 07 2019 Figure 12 19 Trimast System Assemblies DR_0013 ...
Page 116: ...12 40 BL PDSR 30 0319 03 07 2019 Figure 12 20 Trimast Assembly DR_0014 ...
Page 118: ...12 42 BL PDSR 30 0319 03 07 2019 Figure 12 20 Trimast Assembly Continued DR_0014 ...
Page 120: ...12 44 BL PDSR 30 0319 03 07 2019 Figure 12 21 Option for Trimast 189 DR_0042 ...
Page 122: ...12 46 BL PDSR 30 0319 03 07 2019 Figure 12 22 Trimast Reach Assembly DR_0015 ...
Page 124: ...12 48 BL PDSR 30 0319 03 07 2019 Figure 12 22 Trimast Reach Assembly Continued DR_0015 ...
Page 126: ...12 50 BL PDSR 30 0319 03 07 2019 Figure 12 23 Telescopic and Trimast Scissor Assembly DR_0016 ...
Page 128: ...12 52 BL PDSR 30 0319 03 07 2019 Figure 12 24 Trimast Lift Cylinder DR_0017 ...
Page 130: ...12 54 BL PDSR 30 0319 03 07 2019 Figure 12 25 Reach Cylinder DR_0018 ...
Page 132: ...12 56 BL PDSR 30 0319 03 07 2019 Figure 12 26 Tilt Cylinder DR_0019 ...
Page 134: ...12 58 BL PDSR 30 0319 03 07 2019 Figure 12 27 Trimast Free Lift Cylinder DR_0020 ...
Page 138: ...12 62 BL PDSR 30 0319 03 07 2019 Figure 12 29 Hydraulic Lines for Trimast DR_0022 ...
Page 142: ...12 66 BL PDSR 30 0319 03 07 2019 Figure 12 31 Side Shift Assembly DR_0024 ...
Page 144: ...12 68 BL PDSR 30 0319 03 07 2019 Figure 12 32 Side Shift Breakdown DR_0038 ...
Page 150: ...12 74 BL PDSR 30 0319 03 07 2019 Figure 12 35 Chain Assembly DR_0027 ...
Page 152: ...12 76 BL PDSR 30 0319 03 07 2019 Figure 12 36 Telescopic System Assemblies DR_0028 ...
Page 154: ...12 78 BL PDSR 30 0319 03 07 2019 Figure 12 37 Telescopic Mast Assembly DR_0029 ...
Page 156: ...12 80 BL PDSR 30 0319 03 07 2019 Figure 12 37 Telescopic Mast Assembly Continued DR_0029 ...
Page 158: ...12 82 BL PDSR 30 0319 03 07 2019 Figure 12 38 Telescopic Reach Assembly DR_0030 ...
Page 160: ...12 84 BL PDSR 30 0319 03 07 2019 Figure 12 38 Telescopic Reach Assembly Continued DR_0030 ...
Page 162: ...12 86 BL PDSR 30 0319 03 07 2019 Figure 12 39 Telescopic Lift Cylinder DR_0031 ...
Page 166: ...12 90 BL PDSR 30 0319 03 07 2019 Figure 12 41 Hydraulic Lines for Telescopic Mast DR_0033 ...
Page 168: ...12 92 BL PDSR 30 0319 03 07 2019 Figure 12 42 Telescopic Drag Chain Assembly DR_0034 ...
Page 170: ...12 94 BL PDSR 30 0319 03 07 2019 Figure 12 43 Windshield DR_0035 ...
Page 172: ...Big Lift LLC ...