December 2020
Installation, Operation and Maintenance Manual
MAN 606 Rev. 5
Installation
12
Section 2: Installation
Ground
Figure 10
Junction box on Control group (if foreseen)
2.6
Electrical Connections (If Any)
!
WARNING
Use components appropriate as for type, material and dimensions. The connections
should be made by qualified staff. Before carrying out any operation, cut line power off
Safety provisions:
2006/95/EC:
Directive for low voltage equipment
(until 19 April 2016) 2014/35/EU from 20 April 2016
2004/108/EC:
Directive for the electromagnetic compatibility
(until19 April 2016)
2014/30/EU from 20 April 2016
94/9/CE:
Directive and safety instructions for use in hazardous Area
(until 19 April 2016)
2014/34/EU from 20 April 2016
Remove plastic plugs from cables entries
•
Screw firmly the cable glands.
•
Introduce connection cables.
•
Make the connections in compliance with applicable wiring diagrams on the
documentation supplied.
•
Screw the cable gland.
•
Replace the plastic plugs of unused entries with metal plugs.