Bierer HP72 Operating Instructions Manual Download Page 6

 

Testing Between Transformers 

1.

 

Following standard operating procedures, isolate both ends of 
the cable under test using feed thru bushings, see NOTE 1. 

2.

 

Attach Meter & Second probe to appropriate length live line 
tools for the voltage being worked. 

3.

 

Attach the Bushing adapters to Meter & Second probes. 

4.

 

Insert the Meter probe with adapter into the energized bushing of 
transformer and second probe into the open feed thru bushing 
isolating cable under test.  SEE NOTE 2. 

5.

 

On a non-faulted cable the meter will momentarily read into the 
red and diminish into the green area. 

6.

 

On a faulted cable the meter will read within the red area. 

7.

 

A pulsating meter reading indicates the presence of an internal 
flashover. 

8.

 

Discharge cable to ground after each test by contacting tested 
cable with Meter probe and contacting a suitable ground with the 
Second probe.   

WARNING

 

– Failure to discharge cable could result in 

death or serious injury, equipment damage, and/or false readings.  
 

NOTE 1:

 The section of cable under test must be isolated on both ends 

and cannot be connected to/or through equipment or lighting arrestors.   

 

NOTE 2:

  The maximum reading during the hi-potting test is 100%. 

100% represents approximately 70% of the line-to-ground source 
voltage, i.e. 7.2kV X .70 = 5kV.  This value is representative of a direct 
fault on the cable.  Readings near zero represent a good cable with little 
or no cable leakage.

 

 