BIDELI BD-06WT/NT Instruction Manual Download Page 18

5.Many different ways of roasting,low temperature roasting,high temperature 

roasting,the second roasting(Same batch,same beans) ,all of them are up to 
the operators.

Such as:

Roasting from low to high temperature environment ,this kind way of 

roasting.

When the preheated temperature down to150

,

dump the

green beans into drum,adjust the power into half,starting
the low temperature roasting,almost 7-10 minutes to
evaporate the moisture in the green beans slowly and
fully. When you observe the color of beans changed,turn up
the power to rise temperature soon.

(This machine quite works,only can hear the sound of the
beans touch the drum)

when you hear the first crack,observe the beans

 color

through the glass,and take out the beans by samplers to
observe 

(If you also find there are same chaff and smoke

out from the sample hole,you need to turn up the exhaust
air flow to control that issue)

,after finishing the first crack,

turn down the power to reduce the speed of rise temperature,
making the beans finish the second crack completely. Then
open the cooling air flow,make sure it is fully open,adjust the
exhaust air flow at 1 scale,turn on the cooling tray arms,
let the roasted beans out,within 3-5minutes cooling,one batch
is done. 
6.During the cooling process,you can dump another batch green 
beans into the next roasting,just like before what you did to roasting 
consecutively.After first roasting,the temperature is high in the drum,the next 

roasting process will be finished in the shorter time than first batch.  

7.If you keep roasting into 24KG green beans,please turn off the 
chaff collector cyclone switch,clean the drawer and put it back 
where is should be,then keep enjoy roasting process.
8.If you wanna finish roasting,please 

DO NOT

 turn off the main power 

of the roasting machine firstly .For the electric type one,firstly turn off 
the heating switch,for Gas type one,firstly turn off the gas open 
switch,after the temperature down to 80

,then turn off the power 

which is back of the back of the electric cabinet.Then do the clean 
job to prepare for next roasting when you want. 

P18

Summary of Contents for BD-06WT/NT

Page 1: ...Instruction manual Model BD 06WT NT Name 6KG Coffee Roaster GAS P1...

Page 2: ...on our company will response for repairs of the roster for free Under the circumstances below we don t offer free repair during warranty 1 The damage by fire earthquake flood typhoon lightning other n...

Page 3: ...C 220V 50 60Hz Outside Dimension 2200 1300 2200mm Roasting Capacity 3 6kg Batch Drum Rotation Speed 55 65 circles 61circles min standard Drum Power 0 37KW Cooling Mix Rate 10 8 circles min Cooling Mix...

Page 4: ...y information 2 Safety tags 3 Safety device 3 installation 1 transportation 2 Check before installation 3 The installation 4 equipment usage profile 1 General requirements 2 Equipment structure 3 Oper...

Page 5: ...ich hot to puffed the coffee bean u High thermal efficiency utilized could made deep roaster within 15 minutes as well as keep the inherent taste and aroma uUsing an exhaust valve to control the displ...

Page 6: ...ing tray damage variants u In the cooling coil mixing process can not put your hand on the position of stirring blade rotation u Within the drum during rotation can not put hand inner of the drum afte...

Page 7: ...d exists before use 2 Drive parts This label indicates Note Drive site It will occur injuries at the part of drive Please add the safety device when using it and turn on the power switch 3 Caution bur...

Page 8: ...gas supply Drop by 10 it will automatically resume heating gas type baking opportunity to restore the gas supply and automatic ignition 3 Prevent electric leakage devices u The machine cut off the pow...

Page 9: ...3 Preparation before installation roaster 1 Equipment Placement u Baking machine placed on the flat ground 2 Exhaust duct u This baking equipment must be placed in a dry well ventilated place away fr...

Page 10: ...P10...

Page 11: ...llowed either u Liquified petroleum gas pot must be with qualified pressure reducing valve rated pressure 2800KPA the distance between roaster and gas pot shouldn t less than 100cm and the advisable h...

Page 12: ...P12...

Page 13: ...Equipment structure P13 LED Lamp Hopper Hopper Valve Electrical Control Box Vewing Window Front Bearing Adjust Claff Collector Cyclone Bean Release Lever Cooling Tray Discharged Bean Switch Sample Spo...

Page 14: ...st speed meter Exhaust speed controller Drum speed control meter Power Roasting time Drum Switch Air Tempe Timer Cooling fan switch Drum Speed controller Cooling Switch Exhast switch Timer setting Tim...

Page 15: ...ture reduce 10c the machine will supply the gas and fire automatically Pressing shift key down key and up key can set the temperature NOTE In genera please do not use the Mode Key due to the machine h...

Page 16: ...P16 Gas Power adjustment guidance u Gas Pressure Adjustment Knob To left turn down pressure heating power low To right turn up pressure heating power strong...

Page 17: ...request on roasting then no need to do these steps before every starting on 3 Turn on the operation switch Turn on the start switch to preheating NOTE Start switch Can Not be turn on if the operation...

Page 18: ...duce the speed of rise temperature making the beans finish the second crack completely Then open the cooling air flow make sure it is fully open adjust the exhaust air flow at 1 scale turn on the cool...

Page 19: ...oling tray there will collect some coffee beans residue or it will influence the cooling system Besides that the conveyer belt and cooling motor also should be clean and adjusted d If the machine work...

Page 20: ...you add the grease please make sure you have turned off the power and the machine is under the room temperature do this operation to avoid harm b Loose three screws of the front pedestal cap by Allen...

Page 21: ...front bearing bearing seat can adjust the space between drum and the front front panel Loose the 3 three screws In the picture turn left the space will be smaller turn right the space will bigger when...

Page 22: ...llector cyclone if they are blocked sparks and yellow smoke leak out Checking exhaust motor and exhaust pipe if there are chaff in it CAN NOT ignition Checking the Gas cylinder valves if it is unscrew...

Reviews: