
BIBO bar - User Manual
6
CONTENTS
X
Installing your BIBO bar
BEFORE GETTING STARTED
Our experienced installation
teams are here to make sure
that your BIBO bar is correctly
installed. If you are installing
your own BIBO bar, then please
read through all the instructions
carefully, familiarising yourself
with and understanding all
the steps completely before
beginning.
If you are at all uncertain
about any of the steps, please
call us on 0800 00 BIBO (2426)
and ask to speak to one of
our experienced technical
team members.
On average, a BIBO bar
installation should take between
one hour to an hour and a half.
CAUTIONARY NOTES
Your BIBO bar weighs 17kg, so
please take care when lifting it
from its box.
The hot tank switch is clearly
labeled at the back of your BIBO
bar (See
page 4
, number 8).
Please ensure that you do NOT
turn the hot tank switch on
until the BIBO bar has filled
itself with water.
Switching the hot tank switch
on before your BIBO bar has
filled with water will require
a call out from our technical
team (this comes with a fee).
See
page 9,
point i, for more
details on this.
YOUR BIBO BAR TOOLKIT
Your BIBO bar comes with a self installation kit consisting of
a 3m length of 6mm white water supply pipe (1), a BIBO
½
” “T”
connector with a ball valve (2), an easy to fit right angled stem
fitting (3) and a zapper key (4).
1
2
4
3
Printable Guide
All manuals and user guides at all-guides.com
all-guides.com