![BGS technic 8717 Instruction Manual Download Page 3](http://html1.mh-extra.com/html/bgs-technic/8717/8717_instruction-manual_2747014003.webp)
SW-Stahl und Werkzeugvertriebs GmbH
Tel. +49 (0) 2191 / 46438-0
F
5
6
e
s
s
a
r
t
S
r
e
s
u
k
r
e
v
e
L
ax +49 (0) 2191 / 46438-40
e
d
.l
h
a
t
s
w
s
@
o
f
n
i
:l
i
a
M
-
E
d
i
e
h
c
s
m
e
R
7
9
8
2
4
-
D
Instruction Manual
BGS technic KG
Bandwirkerstr. 3
42929 Wermelskirchen
Tel.: 02196 720480
Fax.: 02196 7204820
www.bgstechnic.com
© BGS technic KG, Copying and further use not allowed
Step7
Assemble the blast gun.
Step8
Step9
After you complete the assembly of the SBC.
Then you shall assemble the transparent to lid
(1). Please lock up the movable leaf above the
rear panel (3).
Upon locking up the movable leaf.
Put the transparent top lid under the moveable
leaf to lock up the handle first. Then put item
(22) through the holes on the moveable leaf.
Step 10
Open up the top lid and connect the positioning
chain.
Please connect the two ends of the chain with
the screw and nut as illustrated.
This prevents falling down of the top lid when it
is opened.