2.9
FINISHING OF THE PRODUCT APERTURE / FITTING THE
PLASTERING FRAME
2.9.1
The area below around the appliance will require a high temperature
plaster finish around the appliance due to the high heat output level of
the product, see figure 22. A plastering frame is supplied with the
product to assist in obtaining this finished surface. To prevent plaster
cracking and discolouration, finish the 600mm area above and the
300mm area at the side and below with a high temperature plaster
finish as follows :-
2.9.2
The high temperature plaster should be applied over a heat proof
screed to the manufacturers instructions (see below for manufacturers
contact details) and left to dry for a minimum of 3 days.
2.9.3
Supplier’s contact details for heat proof screed & plaster are as
follows :-
Vitcas Ltd.
or
The Greener Company
8 Bonville Road
The Old Canteen
Brislington
Rosemount Works
Bristol
Huddersfield Road
BS4 5NZ
Elland
Tel : 0117 911 7895
HX5 0EE
www.vitcas.com
Tel : 01925 750290
www.thegreenercompany.com
18
600mm
300mm
300mm
300mm
Completed opening with product
installed - 310mm (H) x 790mm (W)
Plaster
Frame
meshing
Secure
plaster
frame via
product
fixing holes
Fig. 22