Page 1: ...www bevent rasch com FIRE SAFETY 22 01 2021 FENIX4 FENIX Monitoring system Commissioning instruction ...

Page 2: ...ay be damaged in the event of improper use When connecting dampers smoke detectors and other connections the unit must be powered down The cover to access the terminal blocks is removed by unscrewing the cover on the lower part of the control unit The connection terminals for 230 V AC are opened by inserting a screwdriver with a suitable width into the notch above the connector and then bend the s...

Page 3: ...regulation can be performed in two different ways either via a local 0 10 V signal out at the damper or via master communication Modbus TCP or BACnet IP If local control is desired with 0 10 V the FENIX 0 10 V module is used to separate the local control signal from e g a room sensor and the 10 V signal from FENIX that takes over during a functional test to check that the dampers can open 20 Nov 0...

Page 4: ...0 10 V 3 5 X External 0 10 V signal from room sensors for example 0 10 V damper For duct detector RCKD connected in series For room detector RCRD connected in series 24 V DC max 10 VA When separate thermal sensor is used connect in series with motor Thermal sensor Actuator 3 6 1 3 6 1 For duct detector RCKD connected in series For room detector RCRD connected in series 24 V DC max 10 VA When separ...

Page 5: ... detect smoke when no air is transported in the system Outputs Function Description 38 39 40 Main alarm Potential free changeover contact that switches for Detector failure Damper failure Tripped detector External incoming alarm Power outage System failure Communication failure with slave units Internal battery needs to be replaced In normal operation terminals 38 40 have contact Drawn in de energ...

Page 6: ...nhet N A B 46 47 48 EFX communication line Screen N connection optional 4 6 7 8 9 10 DET1 DAMPER DAMPER 3 DAMPER DAMPER 4 5 S2 S6 G0 G 0 10 V 11 13 14 15 16 17 DET2 12 S2 S6 G0 G 0 10 V 18 20 21 22 23 24 DET3 19 S2 S6 G0 G 0 10 V 25 27 28 29 30 31 DET4 N N A A B B 26 S2 S6 G0 G 46 47 48 0 10 V X ON OFF damper X 2 6 4 1 5 1 2 3 5 X 3 5 2 1 1 4 6 2 3 FENIX 0 10 V 0 10 V damper Example 0 10 V Example...

Page 7: ...tem cannot be start ed Use the troubleshooting guide on the display to correct the fault before commissioning Check that the number of fire dampers and smoke detector circuits found match the installation Use the troubleshooting guide on the display if your dampers or smoke detector circuits are not displayed NB The icons also show whether the dampers are of ON OFF type or regulating 0 10 V Exampl...

Page 8: ...CUIT 1 RCUI IRCUIT RCUIT C CIRCUIT 1 SLAVE 1 DAMPER 1 DAMPER 1 AMPER AMPER SLAVE 1 DAMPER 1 AMPER AMPER CIRCUIT 1 CIRCUIT 1 RCUI IRCUIT RCUIT C CIRCUIT 1 SLAVE 1 DAMPER 1 DAMPER 1 AMPER AMPER SLAVE 1 DAMPER 1 AMPER AMPER CIRCUIT 1 CIRCUIT 1 RCUI IRCUIT RCUIT C CIRCUIT 1 SLAVE 1 DAMPER 1 DAMPER 1 AMPER AMPER SLAVE 1 DAMPER 1 AMPER AMPER CIRCUIT 1 CIRCUIT 1 RCUI IRCUIT RCUIT C CIRCUIT 1 SLAVE 1 CIRC...

Page 9: ...ers is performed first after a 5 minute delay which then allows the electric heating coils to cool down Default setting no delay Automatic reset of External incoming alarm Normally an External incoming alarm 34 35 needs to be acknowledged on the unit via the display or terminal block 32 33 default setting this function permits External incoming alarms to be acknowledged automatically when a possib...

Page 10: ...so be done in connection with service or an obligatory ventilation control OVK Instructions for replacing the battery 1 Power down the unit no 230 V AC must be connected when replacing the battery 2 Remove the cover by loosening the screws as shown below 3 Replace the CR2032 battery on the right side of the PCB Replace the battery within 10 seconds to prevent the unit from losing its settings If t...

Page 11: ...11 BORÅS Tel 46 0 33 23 67 80 STOCKHOLM Tel 46 0 8 54 55 12 70 FENIX4 Monitoring system Commissioning instruction ...

Page 12: ...190703 0002_ENG January 2021 teamfront se www bevent rasch com ...