![BetterAir BA-1000 Setup Manual Download Page 2](http://html.mh-extra.com/html/betterair/ba-1000/ba-1000_setup-manual_2743653002.webp)
Basic Overview of Installation on HVAC systems
3)
An electrical connection point is necessary adjacent to the HVAC unit (plug, or direct connection) 115 V / AC
Single Phase breaker rated for a minimum of 10 amps and in accordance with electrical codes in your area.
Output
line Installation
1. The o
utput line
, the white plastic tube - which should be attached to the transparent rubber hose connected
to the
Probiotic container
-
can be installed through any of the four sides of the duct
(top, bottom, or sides).
The line should be inserted at least 1.5” but no more than 3" deep inside the duct.
2.
Ensure that output line is facing the direction of air flow to guarantee Probiotic dispersement throughout the
duct.
HVAC system install:
1.
Mount the BA-1000 unit to the wall using 2 screws or place the unit near the HVAC system. The supporting wall
must be able to hold a weight of up to 45lbs/20 kg.
2.
Drill a hole through the air duct and insert the
white plastic tube
provided.
Attach the transparent rubber hose
to the white plastic tube and connect it to the Probiotic container.
3.
On the HVAC system or air handler, connect the
white plastic
tube to the AC duct at the beginning of the duct
adjacent to the
HVAC unit. On smaller Home/Office Central AC units, connect the tube to the blower housing in
proximity to the
discharge ducts (flex ducts)
or near the return air duct intake.
Bottle Installation
1.
Shake the BA-1000 refill bottle
well
2.
Pour the solution into the aluminum device bottle
3.
Open the BA-1000 door
4.
Disinfect straw with antibacterial swab provided.
5.
Insert and rotate the bottle
6.
Close the door
7.
Plug the power supply
8.
Turn on the machine
*Wrap unit with reflective insulated blanket if
installing in an attic.
Return air duct
Supply air duct
Attention:
Ensure that white plastic
tube is facing the direction of the air
flow.