
4
Installation
Please note:
Before starting any installation, turn off the water supply.
Please note:
Before commencing any installation, the desired location should be checked
before drilling, that no pipes or wires can be damaged.
First, prepare the water supply pipes to match up with the radiator and valve dimensions
being used. Fit the radiator valve tail and nut into the radiator (at both sides) and using
sealing tape, tighten into position, then follow the installation below.
1. Insert the blanking cap and air vent in the top of the radiator at either side, (add a
little sealer tape to secure) and tighten using the spanner, be sure not to
overtighten.
2. Set the position of the wall hanging brackets (on the wall) in relation to the size of
your radiator, the brackets should be located between the last bar and the second
bar in, as shown. Mark these positions on the wall in the required location and use
a spirit level to ensure that these are horizontally and vertically aligned.