April 2005
Target: Terror / Target: Force • Copyright 2005 • Raw Thrills Inc • All rights reserved.
11
Power Up and Startup Sequence
1. Double check all your connections before turning the game on.
2. Turn the game ON.
3. The start up sequence is as follows:
NOTE:
All video output is VGA during this sequence. Your monitor may display a
scrambled image, no image, or “NO SIGNAL” if it is CGA or EGA)
a. BIOS screen appears.
b. Boot splash screen “Loading Please Wait” approx. 30 sec.
c. Error Message Screen if any error present. Refer to troubleshooting
guide to message definition and fix.
4. Display blanks out for approximately 30 seconds as resolution is being detected and
setup. Monitor may display “No Signal” message.
5. Black/Gray screen with X at the center appears briefly.
6. “Loading Please Wait” with version information and build date appears for 45 seconds.
NOTE:
At this time the image should be visible on the monitor if the DIPswitch
settings are correct.
7. Either the game’s attract mode or the Hard Drive CRC check will come up. The CRC
check takes approximately 2.5 minutes. The game then tests the watchdog connection
and reboots.
NOTE: If the video image is scrambled, scrolling, or absent after four minutes, try
different combinations of the VSYNC and HSYNC DIPswitch settings.
Calibration and Functional Test
Note: If the game has a slide or toggle switch for the Test Button, activate switch and return
to OFF position. The game may exit the Test Menu if the Test Button is active or left on the
ON position for more that 3 seconds.
1. Perform gun calibration. Please refer to Section 3.5 of this manual.
2. Perform Switch Test. Please refer to Section 3.4 of this manual.
SECTION 3: TEST AND OPTIONS MENU
Press the
TEST
button to access the
Test Menu
.
Menu Navigation
:
Button Action
Service, Left Start Button
Cycle Through Menu/Options
Test, Right Start Button
Enter Item