Bestplay football goal 150x100 cm Manual Download Page 19

Step 9

Please place the Net (15) on the frame.

15

Step 10

Use the Short Rope (16) through the first hoop of the Top frame, then through the first hole 

of the Net (15), and so on, until all the holes and hoops are assembled.

16

18

Summary of Contents for football goal 150x100 cm

Page 1: ...ADVARSEL Hvis du ikke f lger alle instruktioner pr cist kan det medf re alvorlig personskade Bestplay fodboldm l 150x100 cm...

Page 2: ...ge alvorlige skader p barnet Da metalrammen er elektrisk ledende m elektriske dele aldrig komme i kontakt med fodboldm let Dette inkluderer bl a lamper forl ngerledninger og andet elektrisk udstyr Tje...

Page 3: ...mm 4 stk 13 Skive 4 stk 14 M trik 4 stk 15 Net 1 stk 19 Shooting target 1 stk 16 Kort snor 2 stk 17 Lang snor 2 stk 18 Pl k 4 stk Kugle med elastik 6 stk 6 20 V rkt j 1 stk L Bagerste venstre bundr r...

Page 4: ......

Page 5: ...r 3 og det bagerste h jre bundr r 4 indtil trykknapperne klikker ind i hullerne som vist p tegningen 3 4 Trin 4 7 8 9 S t det verste venstre L r r 7 og det verste h jre L r r 8 ind i topr ret 9 indtil...

Page 6: ...sammen med delene i trin 4 indtil trykknapperne klikker ind i hullerne som vist p tegningen Trin 6 10 11 S t det bagerste topr r 10 ind i det bagerste sider r 11 indtil trykknapperne klikker ind i hu...

Page 7: ...kiver 13 og to M8 m trikker 14 Fastg r det bagerste sider r 11 til det bagerste venstre bundr r 3 og det bagerste h jre bundr r 4 med to M8X40mm bolte 12 to M8 skiver 13 og to M8 m trikker 14 Trin 8 S...

Page 8: ...Trin 9 Plac r nettet 15 p rammen 15 Trin 10 F r den korte snor 16 gennem den f rste ring p rammen verst og derefter gennem det f rste hul i nettet 15 Forts t indtil alle huller og ringe er samlet 16 7...

Page 9: ...rammen og derefter gennem det f rste hul i nettet 15 Forts t indtil alle huller og ringe er samlet 17 17 Trin 12 F r den korte snor 16 gennem den f rste ring nederst p rammen og gennem det f rste hul...

Page 10: ...heder skal du f lge nedenst ende trin for at installere shooting target 19 Plac r forsiden af tr ningssk rmen med logoet der peger ud mod dig selv og s t elastikker med kugler 6 i hvert hj rne L ft el...

Page 11: ...Trin 15 Gentag trin 14 for at fastg re de resterende elastikker med kugler 6 som vist 6 10...

Page 12: ...WARNING Please follow all instructions Failure to follow all instructions can result in serious injury Bestplay football goal 150x100 cm 11...

Page 13: ...It is recommended to be two persons or more to assemble the product Clearance from all nearby objects is essential Place the product away from walls structures and fences Maintain a clear space on all...

Page 14: ...1 pcs 8 Upper Right L Tube 1 pcs 9 Top Cross Beam 1 pcs 10 Back Top Bent Tube 2 pcs 11 Back Side Tube 2 pcs 12 M8X40mm Bolt 4 pcs 13 Washer 4 pcs 14 Nut 4 pcs 15 Net 1 pcs 19 Training Screen 1 pcs 16...

Page 15: ...the Back Side Tube A 1 into the Back SIde Tube B 2 until the push buttons snap into place as shown Insert the Back Left Bottom Tube 3 and Back Right Bottom Tube 4 into the step 1 until the button snap...

Page 16: ...ack Left Bottom Tube 3 and Back Right Bottom Tube 4 until the button snap into the place as shown 3 4 Step 4 7 8 9 Insert the Upper Left L Tube 7 and Upper Right L Tube 8 into the Top Cross Beam 9 unt...

Page 17: ...the assembly step 4 into the assembly step 3 until the button snap into the place as shown Step 6 10 11 Insert the Back Top Bent Tube 10 into the Back Side Tube 11 until the button snap into the plac...

Page 18: ...0mm Bolts 12 two M8 Washes and 13 two M8 Nuts 14 Attach the Back Side Tube 11 to the Back Left Bottom Tube 3 and Back Right Bottom Tube 4 with two M8X40mm Bolts 12 two M8 Washes and 13 two M8 Nuts 14...

Page 19: ...ease place the Net 15 on the frame 15 Step 10 Use the Short Rope 16 through the first hoop of the Top frame then through the first hole of the Net 15 and so on until all the holes and hoops are assemb...

Page 20: ...n through the first hole of the Net 15 and so on until all the holes and hoops are assembled 17 17 Step 12 Use the Short Rope 16 through the first hoop of the bottom frame then through the first hole...

Page 21: ...se follow the below steps to install Training Screen 19 Firstly make out the front surface of Training Screen with logo and the back surface with straps at each corner Then loop one Elastic with ball...

Page 22: ...Step 15 Repeat above step to attach remaining Elastics with ball 6 as shown 6 21...

Page 23: ...22...

Page 24: ...Bestplay A S Knullen 22 5260 Odense S Tlf 45 70 22 72 92 23...

Reviews: