background image

1

Locate and Drill holes
for Z-Hangers.

2

Attach  Z-Hangers
for mounting.

3

Hang board and mark bottom

4

Remove board and drill

5

Attach Lower Brackets and
Hang board

6

Secure Board

Determine board location.  Measure from floor to
the top edge of board.  Mark with pencil line the
corner location.  Measure down from top edge of
board 1-5/8”, and draw line as shown.  Locate
stud near each end of board and drill pilot hole
along line using 1/16” drill bit.

Hang board on
the Z-Hangers
using the Hanging
brackets mounted
on the back of the
board.
Draw line along
bottom edge of
board.

Secure board to bottom
brackets using 2 short
screws as shown.

Attach 2 Z-Hangers using 2 Long Screws as shown

Board Location

Board Location

5

8

Top Edge
of Board

Wall Stud

Draw line

Hanging Brackets on
back of board

1

1

8

Lift and remove board from the Z-Hangers.
Measure up from bottom line of board 1-1/8”, and
draw line as shown.  Locate stud near each end of
board and drill pilot hole along line using 1/16” drill
bit.

Draw line

Board Location

Bottom Edge
of Board

Drill Hole

Secure 2 bottom brackets to the wall using 2 long
screws as shown.
Hang board on the Z-Hangers using the Hanging
brackets mounted on the back of the board.

P1                                 Board

                       1 EA

 Parts List

Should you require assistance during

assembly,  please call our Customer Service

Department

Monday - Friday  8 a.m. - 5 p.m.  Central

Standard Time

Toll-Free Customer Service

1-800-749-2258

E300Px-T1_03/26/10

    SPLASH CORK
E300Px-T1 Tackboard

 Hardware List

A                            Z Hanging Bracket

       2 EA

B                             Bottom Bracket            2 EA

C                            Long Screw                   4 EA

D                            Short Screw                   2 EA

E                         Screw Anchor-Concrete     4 EA

F                          Screw Anchor-Drywall       4 EA

Reviews: