18
s t e P
5
Be careful to assemble all components
in the sequence they are presented.
nOte:
Finger tighten all hardware first. wrench tighten at the end of step 5C.
some components may be pre-assembled. nylon lock nuts will not fully
screw onto bolts, they must be wrench tighten to fully go on.
5a. route Cable (#16) and install 4 Pulleys (#17) on one side of the
machine as shown in step 5 using
3 - (#4) M10x50mm Hex Head Bolt
1 - (#3) M10x80mm Hex Head Bolt
8 - (#7) M10 Flat washer
4 - (#10) M10 nylon lock nut
1 - (#20) Metal spacer
5B. attach strap Handle (#19) to Cable (#16) using snap link (#18)
5C. repeat the previous steps (5a & 4B) on the other side of the machine.
Summary of Contents for BFCCO10
Page 1: ...BFCCO10 O w n e r s M a n u a l V BFCCO10 20210310...
Page 11: ...11 STE P 1 Above shows STEP 1 assembled and completed...
Page 13: ...13 STE P 2 Above shows STEP 2 assembled and completed...
Page 15: ...15 STE P 3 Above shows STEP 3 assembled and completed...
Page 17: ...17 STE P 4 Above shows STEP 4 assembled and completed...
Page 19: ...19 STE P 5 Above shows STEP 5 assembled and completed...
Page 20: ...20 Exploded View Diagram...
Page 21: ...21 NOTE...