Left Frontwall
Step 8
Set Walls
4.
Set wall panels. Secure at corners with 10d sinkers (4 nails per corner). Secure to floor
with 10 sinkers. Disassemble shipping pallet and use the 2x4s to brace the front wall
and the sidewalls.
5.
Install the door header, built above, between the front wall panels.
2x4-7' Wall Brace
12' Sidewall
Door Header
4' Sidewall
1.
Cut (2) two 2x4-10' boards to a length of 99".
2.
Install (2) two 3" x 48" long OSB fillers (from
our kit) on one of the 2x4 boards. Install fillers
1-1/2" from the end and flush with the bottom.
3.
Nail the other 2x4 on top using 10d sinkers.
1-1/2" Space
Flush
OSB Filler
6.
Install (2) two 3" x 48" long OSB fillers on the door header, flush with the bottom.