Repositioned
1x4 Blocks
12'-0" Span
Step 14 Set Gables
Step 16 Assemble Roof Trusses
,<
b&3;5$$('5@$+(7&(;2+(A:7&;(>5$$<()+6":+(@7;;74(7A
'5@$+ ;7 $7A; A$77: 5&% S)! A#$$+:3 "3#&' ,G% 3#&P+:3<
-<
Z5#$ ;2+ @7;;74 +%'+ 7A ;2+ 3#%#&' #&;7 ;2+ ,/_ ;:#4<
=3+(0%('5$V<(&5#$3<
Bottom edge of gable siding
extends over 1x4 trim
Important: Temporarily brace the gables with 2x4s
to secure gables until the roof sheathing is installed!
Front
Wall
,<
b&3+:; $+A; 5&% :#'2; 8:+H@"#$; ;:"33 +&%3 #&;7 ;2+ @$76P3 ;25; 2+$% ;2+ '5@$+ A:54+3 #& 8$56+< b&3":+
385&(#3(,-.HGe(@+;>++&(;:"33(+&%3(53(#&%#65;+%(#&(%:5>#&'(@+$7><
-<
!";; W-X ;>7 iiHfdKe $7&' -/_3 5'5#&3; ;2+ ;:"33 +&%3< B+47V+ ;2+ ,/_ @$76P3 ;25; 3+6":+% ;2+
@7;;74 '5@$+ 8$5;+ 5&% :+873#;#7& ;7 P++8 :5A;+:3 5$#'&+%< D765;+ 5 ,KH,d-e $7&' -/_ :#%'+ @$76P
>#;2 5&'$+% +&%3 5&% #&3;5$$ 5; 8+5P< )+6":+ :5A;+:3 5&% :#%'+ @$76P 5; 8+5P >#;2 5 >77% '"33+;<
b&3;5$$ >#;2 W,_X A7":;++& 0% 67447& &5#$3<
f<
b&3;5$$('"33+;3(7&(;:"33(+&%3<()++(U+;5#$(L<(b&3;5$$(>#;2(W-GX(;>+&;9(0%(67447&(&5#$3<
_<
E5:+A"$$9(A$#8(;:"33(7V+:(5&%(#&3;5$$(5&7;2+:('"33+;(5;(;2+(8+5P<
M<
)+; ;:"33 53#%+< B+8+5; 3;+83 ;7 @"#$% W0X 3#/ 47:+ ;:"33+3<
0<
B+47V+ ;+487:5:9 ,/_ @$76P3<
Detail 'A'
Tip: Place a gusset under
rafters to help level.
Repositioned
1x4 Blocks
Pre-built Truss
Assembly
77-3/8" long 2x4
Truss Rafter
Wood Gusset
18-1/2" Ridge Block
12'-0" Span
Measure Span
from Here
Step 15 Assemble Rear Gable
B+8+5; );+83 ,, ;2:7"'2 ,f ;7 533+4@$+ 5&% 3+; :+5: '5@$+<