Quick Start, Step 3
This menu allows you to determine the calibration date and then
calibrate the instrument. If you calibrate, these data are transferred
to the "Measurement Data" menu and thus activated for the mea-
surement.
1 Read In
Start reading-in the count rates. While the count rate is read in, the
average is calculated and displayed continuously. You define the
reading-in period under
ReadIn Time
(
).
First choose which calibration point you want to read in:
•
BACKGROUND
First you have to measure the background, so that the detector
can correctly compensate for the decay of the radiation source.
Before taking measurements, make sure you do not measure
any radiation from the radiation source
The easiest way to ensure this is if the source is not yet
mounted. Otherwise, close the beam path and fill the container
in addition.
• Cal Point 0%
For this measurement, the level in the tank must be below the
measuring range or the tank must be completely empty. While
you read-in, the level must not rise above 0% and the condi-
tions within the tank must match the conditions during opera-
tion as far as possible.
If appropriate for your application and if it affects the beam
path, this applies, for example, to:
–
Gas density
–
Agitator
–
Cooling/Heating jacket
•
Cal Point 100%
For the measurement, the level in the tank must be above the
monitoring level or the tank must be completely filled. While
you read-in, the level must not drop below 100% and the con-
ditions within the tank must as far as possible match the condi-
tions during operation. If appropriate for your application and if
it affects the beam path, this applies, for example, to:
–
Gas density
–
Agitator
–
Cooling/Heating jacket
When reading-in the count rates, the time remaining up to the end
of the operation is displayed. Finally, you are prompted to confirm
the detected count rate with
OK
. To shorten the read-in process,
you can stop any time by pressing
OK
.
Summary of Contents for LB 480
Page 2: ......
Page 11: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 1 Safety Manual...
Page 12: ...54733 10BA2L 1 12 02 2017 Volume 1...
Page 22: ...54733 10BA2L 1 22 02 2017 4 Transport and Assembly Volume 1...
Page 56: ...54733BA26 1 56 02 2017 5 Explosion Protection Volume 1...
Page 57: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 57 Volume 1 5 Explosion Protection 1...
Page 58: ...54733BA26 1 58 02 2017 5 Explosion Protection Volume 1...
Page 59: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 59 Volume 1 5 Explosion Protection 1...
Page 60: ...54733BA26 1 60 02 2017 5 Explosion Protection Volume 1...
Page 61: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 61 Volume 1 5 Explosion Protection 1...
Page 62: ...54733BA26 1 62 02 2017 5 Explosion Protection Volume 1...
Page 63: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 63 Volume 1 5 Explosion Protection 1...
Page 64: ...54733BA26 1 64 02 2017 5 Explosion Protection Volume 1...
Page 66: ...54733BA26 1 66 02 2017 5 Explosion Protection Volume 1...
Page 67: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 67 Volume 1 5 Explosion Protection 1...
Page 68: ...54733BA26 1 68 02 2017 5 Explosion Protection Volume 1...
Page 69: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 69 Volume 1 5 Explosion Protection 1...
Page 70: ...54733BA26 1 70 02 2017 5 Explosion Protection Volume 1...
Page 71: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 71 Volume 1 5 Explosion Protection 1...
Page 72: ...54733BA26 1 72 02 2017 5 Explosion Protection Volume 1...
Page 73: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 73 Volume 1 5 Explosion Protection 1...
Page 108: ...54733 10BA2L 1 108 02 2017 7 Functional Safety Volume 1 7 13 Functional Safety Certificate...
Page 110: ...54733 10BA2L 1 110 02 2017 7 Functional Safety Volume 1...
Page 112: ...54733 10BA2L 1 112 02 2017 8 Visual Inspection Volume 1...
Page 128: ...54733 10BA2L 1 128 02 2017 9 Radiation Protection Volume 1...
Page 147: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 147 Volume 1 1 Notes...
Page 149: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 2 Installing SENSseries...
Page 150: ...54733 10BA2L 2 150 02 2017 Volume 2...
Page 170: ...54733 10BA2L 2 170 02 2017 1 System Description Volume 2...
Page 240: ...54733 10BA2L 2 240 02 2017 4 Repair Maintenance and Upkeep Volume 2...
Page 288: ...54733 10BA2L 2 288 02 2017 5 Technical Information Volume 2...
Page 297: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 2 297 Volume 2 2 Notes...
Page 299: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 3 Operation with HART Communicator...
Page 300: ...54733 10BA2L 3 300 02 2017 Volume 3...
Page 390: ...54733 10BA2L 3 390 02 2017 3 Getting Started via the HART Communicator Volume 3...
Page 410: ...54733 10BA2L 3 410 02 2017 6 Functional Processes Volume 3...
Page 428: ...54733 10BA2L 3 428 02 2017 7 Explanations Volume 3...
Page 440: ...54733 10BA2L 3 440 02 2017 8 Error Handling Volume 3...
Page 444: ...54733 10BA2L 3 444 02 2017 9 Setup Protocol Volume 3 Path Parameters Unit Standard SETUP...
Page 445: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 3 445 Volume 3 3 Notes...
Page 449: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 449 Volume 1 Notes...