SENSseries LB 480 Level measurement
BERTHOLD TECHNOLOGIES GmbH & Co. KG
2 – 199
Volume 2
2 Installation
2
Installing the rod source shielding
IMPORTANT
Before installing the source shielding or the source, you have to
determine the
background (see Volume 3, chapter 7.1).
Size and position of the measuring range to be covered are deter-
mined in the projection phase for the measuring site and defined
by drawings, sketches or details in writing. For assembly, these
specifications have to be observed closely, since deviations may
cause malfunctions of the measuring system.
standard arrangement.
Fig. 2-24 Rod Source Arrangement
The shielding must be mounted at the measuring site, so that the
top point of the rod source (size
G
) and the center of the detector
are on a horizontal line, which defines the upper point of the mea-
suring range (Max).
Fig. 2-25 Rod source arrangement, see also next table
Installation kit
with clamps,
optional
Bracket provided
by customer
Anti-tipping
device provided
by customer
Mounting base pro-
vided by customer
Rod source
shielding
G
Rod source
So
ur
ce length
Summary of Contents for LB 480
Page 2: ......
Page 11: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 1 Safety Manual...
Page 12: ...54733 10BA2L 1 12 02 2017 Volume 1...
Page 22: ...54733 10BA2L 1 22 02 2017 4 Transport and Assembly Volume 1...
Page 56: ...54733BA26 1 56 02 2017 5 Explosion Protection Volume 1...
Page 57: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 57 Volume 1 5 Explosion Protection 1...
Page 58: ...54733BA26 1 58 02 2017 5 Explosion Protection Volume 1...
Page 59: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 59 Volume 1 5 Explosion Protection 1...
Page 60: ...54733BA26 1 60 02 2017 5 Explosion Protection Volume 1...
Page 61: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 61 Volume 1 5 Explosion Protection 1...
Page 62: ...54733BA26 1 62 02 2017 5 Explosion Protection Volume 1...
Page 63: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 63 Volume 1 5 Explosion Protection 1...
Page 64: ...54733BA26 1 64 02 2017 5 Explosion Protection Volume 1...
Page 66: ...54733BA26 1 66 02 2017 5 Explosion Protection Volume 1...
Page 67: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 67 Volume 1 5 Explosion Protection 1...
Page 68: ...54733BA26 1 68 02 2017 5 Explosion Protection Volume 1...
Page 69: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 69 Volume 1 5 Explosion Protection 1...
Page 70: ...54733BA26 1 70 02 2017 5 Explosion Protection Volume 1...
Page 71: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 71 Volume 1 5 Explosion Protection 1...
Page 72: ...54733BA26 1 72 02 2017 5 Explosion Protection Volume 1...
Page 73: ...SENSseries LB 480 BERTHOLD TECHNOLOGIES GmbH Co KG 1 73 Volume 1 5 Explosion Protection 1...
Page 108: ...54733 10BA2L 1 108 02 2017 7 Functional Safety Volume 1 7 13 Functional Safety Certificate...
Page 110: ...54733 10BA2L 1 110 02 2017 7 Functional Safety Volume 1...
Page 112: ...54733 10BA2L 1 112 02 2017 8 Visual Inspection Volume 1...
Page 128: ...54733 10BA2L 1 128 02 2017 9 Radiation Protection Volume 1...
Page 147: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 147 Volume 1 1 Notes...
Page 149: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 2 Installing SENSseries...
Page 150: ...54733 10BA2L 2 150 02 2017 Volume 2...
Page 170: ...54733 10BA2L 2 170 02 2017 1 System Description Volume 2...
Page 240: ...54733 10BA2L 2 240 02 2017 4 Repair Maintenance and Upkeep Volume 2...
Page 288: ...54733 10BA2L 2 288 02 2017 5 Technical Information Volume 2...
Page 297: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 2 297 Volume 2 2 Notes...
Page 299: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 3 Operation with HART Communicator...
Page 300: ...54733 10BA2L 3 300 02 2017 Volume 3...
Page 390: ...54733 10BA2L 3 390 02 2017 3 Getting Started via the HART Communicator Volume 3...
Page 410: ...54733 10BA2L 3 410 02 2017 6 Functional Processes Volume 3...
Page 428: ...54733 10BA2L 3 428 02 2017 7 Explanations Volume 3...
Page 440: ...54733 10BA2L 3 440 02 2017 8 Error Handling Volume 3...
Page 444: ...54733 10BA2L 3 444 02 2017 9 Setup Protocol Volume 3 Path Parameters Unit Standard SETUP...
Page 445: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 3 445 Volume 3 3 Notes...
Page 449: ...SENSseries LB 480 Level measurement BERTHOLD TECHNOLOGIES GmbH Co KG 1 449 Volume 1 Notes...