FILL VALVE INSTALLATION
1. WORK PREPARATION
Remove the inoperative tank fittings and carefully clean the water cistern/tank.
Make sure all debris has been removed prior to installing new tank fittings.
WARNING
Do notuse or drop any chlorine or any chemical related components. Use of such products will:
Result in damage to tank components and may cause flooding and property damage and void warranty.
Do not overtighten nuts, or tank/bowl may crack.
2. FILL VALVE INSTALLATION AND WATER LEVEL ADJUSTMENT
1. Please read carefully the following installation instructions in
order to avoid component damage or injury to the installer.
2. The instructions have been composed based in the latest product
specifications. We reserve the right to make modifications to the
packaging and specifications without providing prior notification.
3. When installing the fill valve,the critical level on the fill valve
(identified on the valve marked ”CL”) should be at least 1”)
above the top of the overflow pipe of the flush valve.This is a
plumbing code.
4. We shall not be responsible for failures that are contributed to the
use of parts other than those specified.
5.
Water Temperature: 2°C to 45°C.
6. Water Pressure Range: 0.2 Bar to 8 Bar.
Refill tube
overflow pipe
bracket
bracket
bolt
overflow
pipe
tank
overflow
pipe
water supply
pipe
inlet adaptor
water supply
switch
screw rod
bolt
1. Unscrew the bracket bolt and locate/install the fill valve onto overflow pipe of flush valve.
2. Then tighten the bracket bolt.
3. Connect water supply into inlet shank , turn on the water supply valve (angle stop) (Make sure that refill tube has
been inserted in the flush valve overflow pipe in the event the toilet requires refill to the bowl).
4. Check if the inlet valve is under normal operation and adjust the inlet valve float adjustment thumbscrew clockwise
(for higher float & water level) or anticlockwise (for lower float & water level) according to the requirements.