background image

T-junctions

Crossroads

1.)

In the menu point >Choose<, use "1" or "3" to select the required type of
traffic control, e.g. "T-junction" (function as signal system for traffic
control at T-junctions).

2.)

Press "4" to confirm your selection (e.g. T-junction) and thus go to the
next menu point. Use "1" and "3" to stipulate the corresponding red
phases as >RED 1< to >RED 3<.

>>>>>>

3.)

Press "4" to confirm your selection and go to the next menu point
>Green 1<. Use "1" and "3" to adjust the required green phases.
Now proceed in the same way for >Green 2< and >Green 3<, pressing
"4" to confirm your inputs.

>>>>>>

This already completes all the inputs for traffic control at T-junctions: you can now
program the signals accordingly, as described on page 5!

1.)

In the menu point >Choose<, use "1" or "3" to select the required type of
traffic control, e.g. "crossroads" (function as signal system for traffic
control at crossroads).

Now select the red and green phases as described above. This time, you have to enter
four values in each case for red (1 – 4) and for green (1 – 4).

This already completes all the inputs for traffic control at crossroads: you can now
program the signals accordingly, as described on page 4!

5

Choose < >

T-junct.

RED

1

= > 16 s

RED

3

= > 16 s

GREEN 1

= > 20 s

GREEN 3

= > 20 s

Choose < >

crossrds

Summary of Contents for MPB 1400

Page 1: ...Operating Instructions Construction Site Traffic Signal System MPB 1400 GB ...

Page 2: ......

Page 3: ...emenu Your national language is already adjusted when thehandboxisdelivered If you should prefer another language you canchangethisaccordingly Adjusting the language To do so press buttons 1 2 4 ON at the same time on the hand box which has been switched off and hold them for 5 seconds until the hand box has introduced itself and the language selection menu appears Now use buttons 1 or 3 to select...

Page 4: ...als have been placed next to each other for commissioning please make sure that they are spaced at intervals of approx 3 metres This ensures that the infrared signals of the hand box can be unequi vocally allocated to each individual signal Data can be entered in the hand box at any point in time even in a different space and timefromthesignalsthemselves Pleaseproceedasfollows 1 Press ON to switch...

Page 5: ...lternating one way traffic 4 Press 4 to confirm your selection e g one way thus moving to the next menu point Stipulate the corresponding red phase e g indicative values stated in the table on page 10 of these instructions or sticker on the hand box as RED 1 using 1 and 3 As a simple guide you can calculate at least 12 seconds red phase for every 100 m construction site length based on a clearance...

Page 6: ...sending data orimprovetheangletothesystemifsignal1 doesnotstart If you have pressed OK as confirmation you now have up to 15 minutes time to programthesecondsignal Thedisplaythereforeshows The signal system has now been successfully programmed with the data which you had entered previously in the hand box alternating one way traffic control has now started Please continue reading on the next page ...

Page 7: ...for Green 2 and Green 3 pressing 4 to confirm your inputs This already completes all the inputs for traffic control at T junctions you can now programthesignalsaccordingly asdescribedonpage5 1 In the menu point Choose use 1 or 3 to select the required type of traffic control e g crossroads function as signal system for traffic control at crossroads Now select the red and green phases as described ...

Page 8: ...eagain Thedisplayshows Press 4 to move on in the menu and now define the time phases necessary for the procedure as described above You can then allocate the time inputs for each group to up tomax 9synchronisedparallelsignals After entering the required number of parallel signal heads in the required groups you can now program them according to your allocation and as described above You will now s...

Page 9: ... OK at every signal head Select in the hand box The selected signal head flashes yellow Please repeat the input at the other signal head To stop the flashing mode switch back to Automatic as described above Select in the hand box The selected signal head switches to dark lamps off e g at night All of the signal head lamps go off or stay dark Please repeat the input at the other signal head Tostopt...

Page 10: ...redmode switchbacktoAutomaticasdescribedabove Select in the hand box The selected signal head switches to continuous green e g to releaseatrafficjam CAUTION You must activate a defined status at both signal heads to avoid any misunderstandings in the construction site traffic For example if you switch signal 1 to green then you must set signal 2 to red beforehand Please repeat the appropriate inpu...

Page 11: ...hange from green to yellow the green LED at the signal head programmed as signal 1 flashes once twice at signal 2 three times at signal 3 etc This shows youhow thecorrespondingsignalheadhasbeenprogrammed When the battery has a voltage level of approx 9V the corresponding signal head switches the lamps off Replace the flat battery with a fully charged 12V 170 Ah battery The battery ies are accommod...

Page 12: ...your individual user code from 0 to 999 To create this code after switching the hand box on use 2 to go to the User code menu Use 1 and 3 to select a personal number sequence From now on the signal code always has to be programmed with the same user code or with the same adjusted hand box To change the code disconnect the batteries from the signal and wait for approx 5 minutes until the LED flashi...

Page 13: ...CB please separate from the operating voltage by disconnecting the batteries in the battery casing Now disconnect the cable lead from the control PCB to the signal head by simply pulling the plug terminal upwards This means that you do not have to unscrew the cables Please pay attention to correct polaritywhenfittingthenew controlPCB Colourofthewire wires Explosion drawing of MPB 1400 control hous...

Page 14: ... snap clips on the right front side of the control door so as to hinge the door open You are now looking at the back of the reflector you can see four red ring eyelets holding the reflector around the outside Now lift these holders off the reflector without using a tool and simply bend up all the ring eyelets The reflector is released andyoucannow pullthebulbouttothefront Replace the defect haloge...

Page 15: ...Aluminium traffic signal stand Door Mounting tube adjustable in height Wheel with hub cap Fastening strap for signal head Fastening strap for signal head Sealing cap 13 similar illustration ...

Page 16: ...tria front black 210 mm with yellow lens EA 2019 S Signal head door type Austria front black 210 mm with green lens EA 2020 Lens red type Austria 210 mm EA 2021 Lens yellow type Austria 210 mm EA 2022 Lens green type Austria 210 mm EA 2030 Visor type Austria 210 mm EI 0024 Reflector 210 mm with halogen socket G4 EI 0023 Reflector 210 mm for halogen socket G4 EG 0084 Socket G4 EG 0041 Halogen lamp ...

Page 17: ...15 ...

Page 18: ...e does not cover any wear or damage caused by negligent or incorrect handling If in exceptional cases at the customer s request warranty repairs are to be carried out on site i e at the road works where the system causing the complaint has been installed the service technician s travel expenses and journey times are not covered by thewarrantyandshallbeinvoicedseparatelytotheclient The place of jur...

Page 19: ......

Page 20: ...11 2015 ...

Reviews: