30
Step 6:
Check the guy wires after 2 or 3 weeks and tighten as required. Depending on the soil
type, it may require one or more checks and adjustments before the tower and anchors
have fully settled.
Installation instructions for the PowerCenter controller are provided in the EXCEL1
Owner’s Manual.
Summary of Contents for Tilt Tower
Page 8: ...7 Figure 2 Anchor Layout ...