Filling the circuit

Perform the following steps before starting up the system.

1 - FLUSHING AND SEAL TESTING THE SYSTEM

If copper piping has been used and joints have been hot brazed, flush out the system to remove any brazing residues. 

Seal test the system after you have flushed it out.

Fill the solar collector with anti-freeze heat transfer liquid immediately after flushing it out, because flushing water 

may remain trapped in the circuit (with a consequent risk of freezing).

The anti-freeze fluid supplied as an accessory has been specially formulated for use in solar applications, and 

maintains its characteristics over its entire working life. The mix is also non-toxic, biodegradable and biocompatible.

Do NOT part fill the circuit with anti-freeze then top up with water.

Temperatures in excess of the specified working temperature can cause the anti freeze to break down. This is easily 

visible because the liquid becomes darker.

FILLING THE CIRCUIT

2 - FILLING

1  Open the non-return valve (A)

2  Open the air vent at the highest point in the system (see 

figure alongside) and keep it open throughout the filling 

operation

3  Open the vent valve (7)

4  Pump the heat transfer fluid around the circuit with an 

external  filling  pump  until  all  air  bubbles  have  been 

eliminated. Close the manual bleed valve

5  Temporarily raise the pressure in the system to 4 bar

6  Start up the system for about 20 minutes

7  Bleed the circuit again from step 2 until all the air has 

been removed

8  Set the circuit pressure at the boiler according to the 

table below in order to ensure a minimum pressure of 

1.5 bar at the height of the collector field.

9  Close the non-return valve (A) and any open vent valves 

to prevent the heat transfer fluid from evaporating.

°C

M

A

R

M

7

Manual bleed

valve (accessory)

Anti-freeze mix

Heat exchanger

of solar storage

cylinder

Solar collectors

Heat

transfer fluid

filling pump

Water control system

H

H

Pressure at boiler

up to 15 m

3 bar

15 - 20 m

3,5 bar

20 - 25 m

4 bar

25 - 30 m

4,5 bar

General rule: p [bar] = 1.5 + H [m] / 10

Summary of Contents for SCV-25

Page 1: ...Installation Manual Solar Solar collector SCV 25 Installation Manual EN...

Page 2: ...e used in this manual b CAUTION Identifies actions that require caution and adequate preparation a STOP Identifies actions that you MUST NOT do This manual Code Rev comprises pages GENERAL INFORMATION...

Page 3: ...et P2 H2 L1 L2 H1 L3 Seal Insulation Bottom pipe Glass Vacuum Absorbent coating Collector foot Support frame Direction of flow Evacuated tube Aluminium absorber Top cover plat Top pipe Reflective mirr...

Page 4: ...IMENSIONI 2046X1187X90 mm SUPERFICIE LORDA 2 43 m2 TEMPERATURA DI STAGNAZIONE 201 C SUPERFICIE DI APERTURA 2 20 m2 CONTENUTO LIQUIDO 1 6 l SUPERFICIE ASSORBITORE 2 15 m2 PESO A VUOTO 36 5 kg LIQUIDO T...

Page 5: ...010 0 011 W m2 K2 Description U M IAM T 50 1 07 IAM L 50 0 954 Efficiency col 64 Tested according to EN 12975 referred to a 33 3 water glycol mix flow rate of 170 l h and irradiation G 800W m2 Tm Col...

Page 6: ...nd Altitude m a s l Total load on roof from wind and snow loads and collector weight kg At angle of 45 At angle of 20 At angle of 45 At angle of 20 SCV 25 0 10 low 60 40 100 424 546 10 20 low 80 50 25...

Page 7: ...nut ring nut union olive olive ring nut union olive olive ring nut stub pipe stub pipe stub pipe Collectors in the same line must be connected so that the heat transfer fluid flows through them in se...

Page 8: ...k 16 Manual bleed valve accessory 17 Storage cylinder bottom temperature sensor 18 Storage cylinder top temperature sensor 19 Heat transfer fluid recovery M Collector outlet R Collector return b Conne...

Page 9: ...r 700 800 900 600 500 400 300 200 100 0 0 500 1000 1500 2000 2500 3000 FLOW RATE l h Diameter of connection pipes for a specific flow rate of 30 lt m2 h Total surface area m2 2 4 6 12 14 20 Diameter o...

Page 10: ...n integral part of the so lar connector Once located read it thoroughly and keep it safe A B Handling Once you have removed the outer packaging proceed as follows to unpack and handle the solar collec...

Page 11: ...in con formity to relevant standards Lagging and insulation must be protected against damage by the weather and birds and animals Angle of collectors General Solar collectors are designed to be insta...

Page 12: ...because the liquid becomes darker FILLING THE CIRCUIT 2 FILLING 1 Open the non return valve A 2 Open the air vent at the highest point in the system see figure alongside and keep it open throughout th...

Page 13: ...required if this pump is used Checks On completion of the installation perform the checks listed in the table below CHECKS Collector circuit Cold circuit pressure ____bar see table above Collector cir...

Page 14: ...e tube 3 downwards twisting it gently to re lease it from the top seal Remove the tube from the bottom of the collector If you do not have sufficient room to remove the tube down wards proceed as foll...

Page 15: ...fault e g a large dent is found they can be replaced quickly and easily Proceed as follows taking all the necessary precautions to remove a damaged reflector Unscrew and remove the plug 1 from the fo...

Page 16: ...23 A 23900 Lecco LC www berettaboilers com The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore...

Reviews: