background image

BenQ Projector Ceiling Mount Guide 

 

Installing a Projector with the Ceiling Bracket    5 

 

 
Join the TUBE and the U-PLATE with two TUBE BOLT sets (bolt and nut). 

 

 
Install the PIPE and the TUBE with two L-ADJUST BOLT sets (bolt & nut). 

 

   
Install the base-assembly. 

 

STEP D1

 Attach the PIPE-BASE to the 

H-ADJUST ADAPTER with two M4 screws. 

 

 

 
 
 

STEP D2

 Put together the V-ADJUST ADAPTER 

and the PROJECTOR ADAPTER with one V-ADJUST 
BOLT set (bolt, washer and nut). Then tighten the M4 
screws on both sides. 
 

 

 

PIPE-BASE 

H-ADJUST ADAPTER 

M4 screw 

STEP D

 

V-ADJUST BOLT 

V-ADJUST ADAPTER 

WASHER 

M4 screw 

NUT 

TUBE BOLT x 2 

NUT x 2 

TUBE  

STEP B

 

PIPE 

L-ADJUST BOLT x2 

NUT x 2 

STEP C

 

All manuals and user guides at all-guides.com

Summary of Contents for PB8120 - SVGA DLP Projector

Page 1: ...or the parts provided with the bracket 5 Do not use damaged parts If any parts become damaged contact your dealer 6 All bolts and screws must be tightened securely 7 Make sure not to block any ventila...

Page 2: ...E BASE H ADJUST ADAPTER PROJECTOR ADAPTER V ADJUST BOLT NUT x 7 WASHER x 1 M4 SCREW x 10 BOLT x 6 TUBE BOLT x 2 L ADJUST BOLT x 2 PIPE BOLT x 2 Names of Parts U PLATE TUBE TUBE BOLT x 2 L ADJUST BOLT...

Page 3: ...0 81 61 131 160 50 102 76 164 200 60 122 91 197 241 70 142 106 230 281 80 162 122 263 321 90 183 137 296 361 100 203 152 328 401 125 254 190 411 501 150 305 228 493 601 175 355 266 575 702 200 406 304...

Page 4: ...agram of completed installation Ceiling Mount Device Installation Procedure Insert the U PLATE into the CEILING ADAPTER and tighten two M4 screws from the bottom into the screw holes Then attach the t...

Page 5: ...bly STEP D1Attach the PIPE BASE to the H ADJUST ADAPTER with two M4 screws STEP D2 Put together theV ADJUST ADAPTER and the PROJECTOR ADAPTER with oneV ADJUST BOLT set bolt washer and nut Then tighten...

Page 6: ...with four M4 screws Join the BASE ASSEMBLY and the ceiling mount device with two PIPE BOLT sets bolt and nut Two people are required for the completion of this step Installation finished M4 screw Ceil...

Page 7: ...3 Remove the L ADJUST BOLTS from the PIPE 4 Adjust to the correct position for the height of the screen The height can be adjusted to 225mm or any value in a range between 555mm and 765mm in increment...

Page 8: ...PE BASE and the H ADJUST ADAPTER 4 The swivel angle can be set within a range of negative to positive 30 degrees Vertical Angle Adjustment 1 Loosen the two sets of screws connecting the H ADJUST ADAPT...

Page 9: ...IAGRAMS Specifications Adjustment Range Height Horizontal angle Vertical angle 225mm 555mm 585mm 615mm 645mm 675mm 705mm 735mm and 765mm 30 to 30 degrees 5 to 15 degrees Weight 3 2 kg Loading 3 5 kg D...

Reviews: