9
General specifications
1
C
ERTIFICATION
D
EFINITION
OF
DESIGN
CATEGORIES
The OCEANIS 50 NEW model conforms to the directive 2003/44/CE
CE Category
Persons Maximum
A
8 persons
B
9 persons
C
14 persons
D
14 persons
Design category
Wind force
(Beaufort scale)
Significant height
of waves to be
considered
(in metres H 1/3)
Vessel designed for
navigation:
A - "At high sea"
B - "In open sea"
C - "Near to the coast"
D - "In sheltered
waters"
Over 8
Up to and including 8
Up to and including 6
Up to and including 4
Over 4
Up to and including 4
Up to and including 2
Up to and
including 0,3
S
AILS
- M
AST
WITH
IN
-
MAST
FURLING
Furling mainsail ............................................................... 45,00 m
²
Genoa............................................................................... 66,70 m
²
Symmetric spi ................................................................. 151,00 m
²
S
AILS
- C
LASSICAL
MAST
Classical mainsail ............................................................ 57,20 m²
Genoa .............................................................................. 66,70 m
²
Symmetric spi................................................................. 151,00 m
²
A
LL
VERSIONS
I ......................................................................................... 18,25 m
J........................................................................................... 5,62 m
P ....................................................................................... 17,00 m
E .......................................................................................... 5,71 m
The sails are the main propulsion means of the OCEANIS 50 NEW.
Summary of Contents for OCEANIS 50 NEW
Page 1: ...OCEANIS 50 NEW Code 135020 Index E Owner s Manual ...
Page 2: ......
Page 4: ......
Page 8: ......
Page 10: ......
Page 11: ...7 General specifications Technical specifications Certification Design category Your boat 1 ...
Page 16: ......
Page 30: ...26 USE OF THE MANUAL BILGE PUMP Location Operation Capacity 40 5 litre minute Safety ...
Page 32: ...28 USE STEERS FRANK OF HELP Sector access port Tiller in position Safety ...
Page 34: ......
Page 35: ...31 Hull Maintenance of the Hull Lifting 3 ...
Page 36: ...32 LIFTING Wetted area 48 m Hull ...
Page 38: ......
Page 39: ...35 Deck Navigation Deck Layout Stability Prevention of man overboard Mooring lines 4 ...
Page 42: ......
Page 43: ...39 Steering system Steering Gear 5 ...
Page 44: ......
Page 46: ......
Page 47: ...43 Water and sewage water Water system Distribution 6 ...
Page 52: ......
Page 53: ...49 Electrical equipment General information 12 V DC system 110 220 V AC system 7 ...
Page 54: ...50 Schematic diagram B Electrical equipment ...
Page 58: ......
Page 59: ...55 Engine General information Engine fitting 8 ...
Page 61: ...57 Engine ENGINE FITTING 8 ...
Page 62: ...58 DIAGRAM LOCATION Engine ...
Page 63: ...59 Engine 8 ...
Page 66: ......
Page 67: ...63 Launching Launching recommendations Stepping the mast 9 ...
Page 69: ......