27
189143 RCD-2
Index A
5.2
STANDING RIGGING
Reference
Designation
Quantity
1
Forestay
1
2
Upper shroud
2
3
Diamond
2
- The initial commissioning of your boat will
require a lot of skill and care. The proper working
of all your boat's equipment is the result of the
quality of the commissioning operations.
For this reason the stepping of the mast must be
carried out under the responsibility of your
dealer the first time the mast is stepped.
- Before each trip, carefully inspect the mast
from top to bottom.
- Periodically check the rig tension and the
tightness of the locknuts and bottle screw clevis
pins.
- When not sailing, slacken the genoa halyard
and keep it away from the forestay (risk of
halyard becoming furled around the forestay,
which can lead to the stay breaking and
dismasting of the boat).
Rigging an
d sails
5
Summary of Contents for First 20
Page 1: ...189143 RCD 2 Index A OWNER S MANUAL ...
Page 2: ......
Page 4: ......
Page 8: ......
Page 12: ......
Page 13: ...13 DESIGN CATEGORIES AND DISPLACEMENT Design categories 16 2 ...
Page 17: ...17 STABILITY AND BUOYANCY Stability data 18 Access to the boat 19 3 ...
Page 20: ......
Page 21: ...21 MANOEUVRABILITY Visibility from the steering station 23 4 ...
Page 24: ......
Page 58: ......
Page 64: ......
Page 72: ......
Page 80: ......
Page 86: ......
Page 87: ...87 STEERING SYSTEM General points 88 Centreboard 88 Layout diagram 90 11 11 ...
Page 89: ...89 189143 RCD 2 Index A Layout of components Centreboard Mechanism Steering system 11 11 ...
Page 109: ...109 ENVIRONMENT Waste management 110 15 15 ...
Page 111: ...111 APPENDIXE Meaning of the labels 112 ...
Page 114: ......