Quatra™ Full-Rise Scissor Lift
19
P/N 5900085 — Rev. A1 — October 2019
Align the Frames into Position
Once you have created the Chalk Line Guides, move the Frames into position.
To align the Frames into position
:
1.
Use a Forklift or Shop Crane to lower the Frames into the layout you created.
The Frames go on the
inside
of the Chalk Lines.
2.
Align the Base Plates with the Chalk Lines.
3.
Move the two Frames into position where the Left and Right Chalk Lines intersect the alignment
Chalk Line.
4.
Measure the distance between the two Platforms at point
a
and
b
.
The Frames need to be same distance apart at both points. If
a
and
b
are not the same, adjust the
Platform locations; make sure they are the same distance apart and parallel to each other.
5.
Double check that the Frames are correctly positioned and the Utility Rails are facing the inside of
the Lift.
Lift the Platforms off the Bases
You must raise the Platforms off their Bases in order to complete other aspects of the installation.
Be
sure to leave the Lift on a Safety Lock when you raise it.
⚠
WARNING
The Frames are extremely large and heavy. You must use a Forklift or Shop Crane
to move the Platform off the Bases; make sure the Safety Locks are engaged when
you reach the desired height.
To lift the Platforms off the Bases
:
1.
Use a Forklift or Shop Crane to raise the Platform off of its Base Plate, using care so that the Base
Plates do not move.
Make sure to hold down the Base while you raise the Platform.
Tip
Once the Platform and Base are separated by more than half an inch (~13 mm), you
can put Industrial Slings (straps) around each end to continue raising the Platform off
the Base.
2.
Raise the Platform to the first Safety Lock, then make sure the Frames are secure on a Locking
position.
⚠
WARNING
Do not leave or work on the Lift without first confirming that the Platforms are
secure on a locking position; if not, you or anyone else working on the Lift could be
seriously injured.
3.
Repeat the same procedure for the other Frame.
Important
:
Do not bolt down the Bases at this point
. This will be done later in the
installation process.
Summary of Contents for Quatra XR-12000L
Page 51: ...Quatra Full Rise Scissor Lift 51 P N 5900085 Rev A1 October 2019 Wiring Diagrams 5585320 ...
Page 52: ...Quatra Full Rise Scissor Lift 52 P N 5900085 Rev A1 October 2019 5585321 ...
Page 53: ...Quatra Full Rise Scissor Lift 53 P N 5900085 Rev A1 October 2019 Labels ...
Page 54: ...Quatra Full Rise Scissor Lift 54 P N 5900085 Rev A1 October 2019 ...
Page 55: ...Quatra Full Rise Scissor Lift 55 P N 5900085 Rev A1 October 2019 Parts Drawings ...
Page 56: ...Quatra Full Rise Scissor Lift 56 P N 5900085 Rev A1 October 2019 ...
Page 57: ...Quatra Full Rise Scissor Lift 57 P N 5900085 Rev A1 October 2019 ...
Page 58: ...Quatra Full Rise Scissor Lift 58 P N 5900085 Rev A1 October 2019 ...
Page 59: ...Quatra Full Rise Scissor Lift 59 P N 5900085 Rev A1 October 2019 ...
Page 60: ...Quatra Full Rise Scissor Lift 60 P N 5900085 Rev A1 October 2019 ...
Page 61: ...Quatra Full Rise Scissor Lift 61 P N 5900085 Rev A1 October 2019 ...
Page 62: ...Quatra Full Rise Scissor Lift 62 P N 5900085 Rev A1 October 2019 ...
Page 63: ...Quatra Full Rise Scissor Lift 63 P N 5900085 Rev A1 October 2019 ...
Page 64: ...Quatra Full Rise Scissor Lift 64 P N 5900085 Rev A1 October 2019 ...
Page 65: ...Quatra Full Rise Scissor Lift 65 P N 5900085 Rev A1 October 2019 ...
Page 66: ...Quatra Full Rise Scissor Lift 66 P N 5900085 Rev A1 October 2019 ...
Page 67: ...Quatra Full Rise Scissor Lift 67 P N 5900085 Rev A1 October 2019 ...
Page 68: ...Quatra Full Rise Scissor Lift 68 P N 5900085 Rev A1 October 2019 ...
Page 69: ...Quatra Full Rise Scissor Lift 69 P N 5900085 Rev A1 October 2019 ...
Page 70: ...Quatra Full Rise Scissor Lift 70 P N 5900085 Rev A1 October 2019 Maintenance Log ...
Page 71: ...Quatra Full Rise Scissor Lift 71 P N 5900085 Rev A1 October 2019 Maintenance Log ...