Commissioning and testing
43
TM800_D00165_00_M_XXEN/06.2015
5.4 Periodic
verification and service
5.4.1
Periodic verification
The following periodic verifications of electrical installations have to be carried out according to the
local or national standards effective at the time of installation. For your Bender products, we recom-
mend:
* This test must only be performed by an authorised electrically skilled person in agreement with the
medical locations concerned.
Before carrying out the tests, please refer to the instructions relating to the functional tests in the
check list. If no national directives apply, you should perform the tests recommended by IEC 60364-
7-710: 2002-11, section 710.62 and DIN VDE 0100-710 (VDE 0100 Part 710):
Task
By Interval
Functional test of IT system monitoring
(insulation, load current, transformer temperature and connec-
tion monitoring) by pressing the test button on the alarm indi-
cator and test combination or on the alarm indicator and
operator panel.
Medical
personnel
Once every
working day
Functional test of the transfer switching device*:
Functional test of the automatic transfer switching device. Fol-
low the instructions in chapter "Testing of the transfer switch-
ing device!
Electrically
skilled person
Once every six
months
Functional test of the IT system monitoring (insulation, load
current, transformer temperature and connection monitoring)
on the insulation monitoring device.
Electrically
skilled person
Once every six
months
Test of the setting values and the changeover periods
Electrically
skilled person
Once every 12
months
Test of the transfer switching device, the IT system monitoring,
and the connection to the SCADA system (Supervisory Control
and Data Acquisition) (if applicable) and the interaction
between the components in the system.
The test includes the following:
- Inspection:
Marking, display elements, mechanical components,
wiring, parameterisation, connection of
third-party equipment, evaluation of the fault memory
- Measurement:
Internal/external supply voltages/potentials,
bus voltage, bus protocol, bus scan
- Testing:
Device function, device communication.
- Documentation:
Test results, recommendations for elimination of defects.
Bender-Service Once
every
24
months