AM5KA Measure Head
RevL Sep 2007
Page 19 of 50
4.
Use a hook to pull the spring out far enough to remove the
screwdriver (Careful not to bend the spring).
5.
Remove the floating encoder assembly.
6.
Repeat for the other side.
7. Remove
anti-rotation screw (if equipped).
8.
Remove snap ring and pull out sliding shaft.
9.
Remove the wheel assembly.
10.
Re-assemble in reverse order.
4.4.6
INSTALLING THE LOAD AXLE WHEEL
1.
Insert the tension wheel into the frame. Make sure the slotted hole
in the tension wheel bushing is on the same side as the roll pin hole
in the frame and the grease hole is on the opposite side.
2.
Use a bolt in place of the load pin to hold it in place. Install an allen
wrench or other long tool to align the hole in the bearing with the
slotted hole in the frame.
Summary of Contents for BAKER ATLAS AM5K Series
Page 15: ...AM5KA Measure Head RevL Sep 2007 Page 15 of 50...
Page 21: ...AM5KA Measure Head RevL Sep 2007 Page 21 of 50...
Page 25: ...AM5KA Measure Head RevL Sep 2007 Page 25 of 50 TOP VIEW...
Page 26: ...AM5KA Measure Head RevL Sep 2007 Page 26 of 50 FRONT VIEW...
Page 27: ...AM5KA Measure Head RevL Sep 2007 Page 27 of 50 REAR VIEW...
Page 41: ...AM5KA Measure Head RevL Sep 2007 Page 41 of 50 7 1 2 ATEX Conformity Schedule...
Page 42: ...AM5KA Measure Head RevL Sep 2007 Page 42 of 50 7 2 ENCODER 7 2 1 ATEX Conformity Certificate...
Page 43: ...AM5KA Measure Head RevL Sep 2007 Page 43 of 50 7 2 2 ATEX Conformity Schedule...
Page 45: ...AM5KA Measure Head RevL Sep 2007 Page 45 of 50 7 3 LOAD PIN 7 3 1 ATEX Conformity Certificate...
Page 46: ...AM5KA Measure Head RevL Sep 2007 Page 46 of 50 7 3 2 ATEX Conformity Schedule 5 3 3...
Page 49: ...AM5KA Measure Head RevL Sep 2007 Page 49 of 50 7 4 2 ATEX Conformity Schedule...